Le Carrefour de la défense rassemble les travaux du DPB sur le budget de la défense et les plans de dépenses du Canada.
{"id":"RP-2425-020-S","is_published":"2024-10-30T12:57:09.000000Z","release_date":"2024-10-30T13:00:00.000000Z","title_en":"The Fiscal Implications of Meeting the NATO Military Spending Target","title_fr":"Les r\u00e9percussions financi\u00e8res de l\u2019atteinte de la cible de d\u00e9penses militaires fix\u00e9e par l\u2019OTAN","internal_id":"RP-2425-020-S","metadata":{"abstract_en":"This report examines the fiscal implications of Canada\u2019s recent commitment to meet NATO\u0027s military spending target of 2% of GDP by 2032.","abstract_fr":"Ce rapport examine les r\u00e9percussions financi\u00e8res de l\u2019engagement r\u00e9cent du Canada \u00e0 atteindre, d\u2019ici 2032, la cible de l\u2019OTAN consistant \u00e0 consacrer 2 % du PIB aux d\u00e9penses militaires.","highlights":[{"content":{"en":"Canada has recently committed to meeting NATO\u2019s 2% of GDP military spending target by 2032-33. According to a PBO hypothetical scenario where this target is met, defence spending would have to nearly double as compared to projections of spending for the current fiscal year (2024-25).","fr":"Le Canada s\u2019est r\u00e9cemment engag\u00e9 \u00e0 atteindre, d\u2019ici 2032-2033, la cible de l\u2019OTAN consistant \u00e0 consacrer 2 % du PIB aux d\u00e9penses militaires. Selon un sc\u00e9nario hypoth\u00e9tique du DPB o\u00f9 cette cible est atteinte, les d\u00e9penses de d\u00e9fense devraient presque doubler par rapport aux d\u00e9penses projet\u00e9es pour l\u2019exercice en cours (2024-2025)."}},{"content":{"en":"DND figures released along with its new defence policy, Our North Strong and Free: A Renewed Vision for Canada\u2019s Defence, project military spending to reach 1.76% of GDP by 2029-30, but these figures are based on an erroneous GDP forecast. Adjusting for the correct GDP growth rates, military spending only reaches 1.58% of GDP by 2029-30, leaving a 0.42 percentage point gap to meet the 2% target by 2032-33.","fr":"Les chiffres du minist\u00e8re de la D\u00e9fense (MDN), publi\u00e9s en m\u00eame temps que sa nouvelle politique de d\u00e9fense, Notre Nord, fort et libre : Une vision renouvel\u00e9e pour la d\u00e9fense du Canada, pr\u00e9voient que les d\u00e9penses militaires atteindront 1,76 % du PIB d\u2019ici 2029-2030; or, ces estimations reposent sur des pr\u00e9visions erron\u00e9es du PIB. Si l\u2019on rajuste ces pr\u00e9visions en appliquant les bons taux de croissance du PIB, les d\u00e9penses militaires n\u2019atteignent que 1,58 % du PIB en 2029-2030, ce qui laisse un \u00e9cart de 0,42 point de pourcentage \u00e0 combler pour atteindre la cible de 2 % d\u2019ici 2032-2033."}},{"content":{"en":"In the hypothetical scenario, the debt-to-GDP ratio initially remains stable before beginning a gradual decline, reaching 38.2% by 2032-33, suggesting that the government can still achieve its goal of a declining debt-to-GDP ratio despite increased military expenditures.","fr":"Dans le sc\u00e9nario hypoth\u00e9tique, le ratio de la dette au PIB reste stable dans un premier temps avant d\u2019amorcer une baisse progressive pour atteindre 38,2 % en 2032-2033, ce qui tend \u00e0 indiquer que le gouvernement peut encore atteindre son objectif de diminution du ratio de la dette au PIB malgr\u00e9 l\u2019augmentation des d\u00e9penses militaires."}},{"content":{"en":"The deficit-to-GDP ratio would be impacted more substantially over the medium term by the increased military spending, failing to reach the stated goal of 1% of GDP by 2026-27, and may exceed guidelines in the latter years of the forecast.","fr":"L\u2019augmentation des d\u00e9penses militaires aurait une incidence plus marqu\u00e9e sur le ratio du d\u00e9ficit au PIB \u00e0 moyen terme, puisque celui-ci n\u2019atteindrait pas l\u2019objectif annonc\u00e9 de 1 % du PIB d\u2019ici 2026-2027 et pourrait d\u00e9passer les lignes directrices dans les derni\u00e8res ann\u00e9es de la p\u00e9riode de pr\u00e9vision."}}]},"updated_at":"2024-10-30T12:57:09.000000Z","type":"RP","slug":"RP-2425-020-S--fiscal-implications-meeting-nato-military-spending-target--repercussions-financieres-atteinte-cible-depenses-militaires-fixee-otan","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2425-020-S--fiscal-implications-meeting-nato-military-spending-target--repercussions-financieres-atteinte-cible-depenses-militaires-fixee-otan","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2425-020-S--fiscal-implications-meeting-nato-military-spending-target--repercussions-financieres-atteinte-cible-depenses-militaires-fixee-otan"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2425-020-S--fiscal-implications-meeting-nato-military-spending-target--repercussions-financieres-atteinte-cible-depenses-militaires-fixee-otan","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2425-020-S--fiscal-implications-meeting-nato-military-spending-target--repercussions-financieres-atteinte-cible-depenses-militaires-fixee-otan"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/ae4029c7de1f5a5bd5a80986f3eb7b283330e7a6728368f825f71a7e8c4bbfb6"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/fd431684c9ddb89422162230f050ab88e406b8cd151a316542a770e8a94894f8"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/73e0e49d5172e34ac967a33c10ebaa04aad1ee7991840de57577500d5772943c","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/27e220e5f7bd0097ae13562bf38a405cc802344320c0a47838c52f01f2162a41","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/dc5b6a86654b4b3dd0a7b860f3ba8818af49ccd0f56b267884dc0204f59cf2ba","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/312c1a66b0677a0ce67d64dcd3ebe88ff67a602ecde720b417d1391e2cd2a9a0","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6e24641ab74b592aed62a60444e727b0976e90eff16b8f28102fec10e964ac0c","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5018aff095102dbe842dbd521f89de1e88f4f9153d6a02302e2e6d5fc9af319e","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/9bf8176bbbf5c773b744f125d74294c9f8c9cc9861df0a84d824e95a5bccdee5","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5d308d131bac7162be95015dab4e281f90d5c465607db0e0495b8b3b5a89879c"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2239711b196988319e6c52b1a2245d8851479d79ce3776e637c3ac77f903494e","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fcdec7c342afb8d1982a8ed60d8277443581b1c748242845b60dee5dba928005","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/19799744bd69586e37ed651657edc86d1b9d11a85a342c9c386870a71245f9ed","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5cfa42ccae3cfa663010ee60eb4457fde856f7d34f897366871ec4c6c5c029d0","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/44aa88406f3f6d667df6fb559f71b1873f7d7b5cfaddbe2d82e3d43add0c5bad","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0797919bf88288acd1e7921f627917e06c8441668c8319139bc01e70697ba2ce","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/29a55f516c946fd8595303b6a99444b9afb6db87ab97dcd3db973b6496f39c58","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/bc06b320841767a14df708131238ea876a60795734210b2726f7c78bf0746fd2"}}},"bills":[],"files":[],"images":[],"bibtex":{"en":"@techreport{PBO-RP2425020S,\n author={Penney, Christopher},\n title={The Fiscal Implications of Meeting the NATO Military Spending Target},\n institution={The Office of the Parliamentary Budget Officer},\n year=2024,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2425020S,\n author={Penney, Christopher},\n title={Les r\\\u0027{e}percussions financi\\`{e}res de l\u2019atteinte de la cible de d\\\u0027{e}penses militaires fix\\\u0027{e}e par l\u2019OTAN},\n institution={Bureau du directeur parlementaire du budget},\n year=2024,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"is_published":"2024-07-08T14:57:03.000000Z","id":"BLOG-2425-005-S","internal_id":"BLOG-2425-005-S","release_date":"2024-07-08T15:00:00.000000Z","updated_at":"2024-07-08T14:57:03.000000Z","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/additional-analyses--analyses-complementaires\/BLOG-2425-005-S--update-canada-military-expenditure-nato-2-spending-target--mise-jour-depenses-militaires-canada-objectif-depenses-2-otan","preview":"https:\/\/www.pbo-dpb.ca\/en\/additional-analyses--analyses-complementaires\/BLOG-2425-005-S--update-canada-military-expenditure-nato-2-spending-target--mise-jour-depenses-militaires-canada-objectif-depenses-2-otan"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/additional-analyses--analyses-complementaires\/BLOG-2425-005-S--update-canada-military-expenditure-nato-2-spending-target--mise-jour-depenses-militaires-canada-objectif-depenses-2-otan","preview":"https:\/\/www.pbo-dpb.ca\/fr\/additional-analyses--analyses-complementaires\/BLOG-2425-005-S--update-canada-military-expenditure-nato-2-spending-target--mise-jour-depenses-militaires-canada-objectif-depenses-2-otan"}},"slug":"BLOG-2425-005-S--update-canada-military-expenditure-nato-2-spending-target--mise-jour-depenses-militaires-canada-objectif-depenses-2-otan","title_en":"Update of Canada\u2019s Military Expenditure and the NATO 2% Spending Target","title_fr":"Mise \u00e0 jour sur les d\u00e9penses militaires du Canada et l\u2019objectif de d\u00e9penses de 2 % de l\u2019OTAN","abstract_en":"Projection of Canada\u2019s future Military Expenditures in relation to NATO\u2019s 2% of GDP target.","abstract_fr":"Pr\u00e9visions des d\u00e9penses militaires du Canada par rapport \u00e0 l\u2019objectif de d\u00e9penses de l\u0027OTAN de 2 % du PIB.","files":[]}
{"id":"RP-2425-010-C","is_published":"2024-06-28T12:57:05.000000Z","release_date":"2024-06-28T13:00:00.000000Z","title_en":"The Polar Icebreaker Project: 2024 Update","title_fr":"Le projet de brise-glaces polaires : mise \u00e0 jour de 2024","internal_id":"RP-2425-010-C","metadata":{"abstract_en":"This report provides an updated independent cost estimate of the Development and Acquisition phases of the Polar Icebreaker Project.","abstract_fr":"Ce rapport pr\u00e9sente une mise \u00e0 jour de l\u2019estimation ind\u00e9pendante des co\u00fbts des phases de d\u00e9veloppement et d\u2019acquisition relatives au projet de brise-glaces polaires.","highlights":[{"content":{"en":"The acquisition of 2 Polar Icebreakers is estimated to cost $8.5 billion. This cost includes all relevant components of the Development and Acquisition phases of the project.","fr":"L\u2019acquisition de deux brise-glaces polaires est estim\u00e9e \u00e0 8,5 milliards de dollars. Ce co\u00fbt comprend toutes les composantes pertinentes des phases de d\u00e9veloppement et d\u2019acquisition du projet."}},{"content":{"en":"The first Polar Icebreaker is expected to be delivered in 2030-2031, and the second in 2032-2033. This represents a 1 and 2 year delay for the first and second vessels, respectively, relative to prior PBO work on this Project in 2021.","fr":"Le premier brise-glace polaire devrait \u00eatre livr\u00e9 en 2030-2031 et le deuxi\u00e8me, en 2032-2033. C\u2019est, respectivement, un an et deux ans plus tard que ce qui \u00e9tait pr\u00e9vu lorsque le DPB s\u2019est pench\u00e9 sur ce projet pour la premi\u00e8re fois, en 2021."}},{"content":{"en":"A one-year delay to both vessels is estimated to cost an additional $260 million while a two-year delay is estimated to cost an additional $530 million.","fr":"Pour les deux navires, un retard d\u2019un an entra\u00eenerait un co\u00fbt suppl\u00e9mentaire de 260 millions de dollars, et un retard de deux ans entra\u00eenerait un co\u00fbt suppl\u00e9mentaire de 530 millions de dollars."}}]},"updated_at":"2024-06-28T16:04:57.000000Z","type":"RP","slug":"RP-2425-010-C--polar-icebreaker-project-update--projet-brise-glaces-polaires-mise-jour-2024","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2425-010-C--polar-icebreaker-project-update--projet-brise-glaces-polaires-mise-jour-2024","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2425-010-C--polar-icebreaker-project-update--projet-brise-glaces-polaires-mise-jour-2024"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2425-010-C--polar-icebreaker-project-update--projet-brise-glaces-polaires-mise-jour-2024","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2425-010-C--polar-icebreaker-project-update--projet-brise-glaces-polaires-mise-jour-2024"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/d990f39403c8989b774f6849a33ac0383c7bfa1aef6db079d95a626e454b2124"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/c4405871f59766321f1cf7f4b9011b3551ddef9a7b635c61d35d3d9f102dece8"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2ceab8eb854958a60f5943c926c933d32bfa238a45e60e86669d7166aa638182","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4ee6edacfdd8c2f2acc1803cbae95ff07360af31fe795002a3ed30d754f5f937","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c48eb31b5c0066035ba293585d3b27e15b0bc228584f9abdf38f2a56dc86e3be","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b3626736b8d1f741296cadbe2aeba5913c8b674278a75d6bf9e54de1050036a4","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/24a96123cfa2e3ca8b19a9834444b5a8d59daf5498ae06952bb90dc344711e4f","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3638fab880b8021852c8881217d73befd76f33ac161b7ff3d4f2d3faff9e2c19","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8e1ad42e7983a45ca9ac1fea6daef6667abca0c248edec02bd399e236f702880","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/9d778cf70aea09457bf371335f198313c5f9c34b841c404b05a4644e56590f30"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/27f183e5bb8f2114df6ea122de72e13c2b1e23c76347985b9717e4373323fbcf","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/cddd111cb88f42cce99f0d62d0eb31a2f0efebea6bff8843e62d8943926a2561","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fbf99e039280bf2b876031a1f7804f3f2c5f47f0667c77083adef9f1709f757a","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e5624c5dab61bec6f34b31e3507b4f373f60106d05e2ab0d940dedda280e01e0","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c29a65ecd9f3b24bcb1af773cafd002281cdd55de16f36876c3193698788c4f3","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2c0a4c8d61ee68174670cfef381db459960b5055497b9164e69b4e63110f5cd3","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/db66d050a1358f9fe0f77e593146078de98a9861c8d72dc2da2b8a0698feaa63","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f0f836d88aa679345339179a335dddeb67602feecbe01de556d34c9537d42585"}}},"bills":[],"files":[],"images":[],"bibtex":{"en":"@techreport{PBO-RP2425010C,\n author={Creighton, Mark and Kho, Albert},\n title={The Polar Icebreaker Project: 2024 Update},\n institution={The Office of the Parliamentary Budget Officer},\n year=2024,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2425010C,\n author={Creighton, Mark and Kho, Albert},\n title={Le projet de brise-glaces polaires : mise \\`{a} jour de 2024},\n institution={Bureau du directeur parlementaire du budget},\n year=2024,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2324-025-C","is_published":"2024-02-28T13:57:03.000000Z","release_date":"2024-02-28T14:00:00.000000Z","title_en":"Planned Capital Spending under Canada\u2019s Defence Policy: 2024 Update","title_fr":"D\u00e9penses en capital pr\u00e9vues au titre de la politique de d\u00e9fense du Canada : Mise \u00e0 jour de 2024","internal_id":"RP-2324-025-C","metadata":{"abstract_en":"This report analyses Department of National Defence planned capital spending under Strong, Secure, Engaged, announced in 2017, as of 2024.","abstract_fr":"Ce rapport analyse, en date de 2024, les d\u00e9penses en capital pr\u00e9vues du minist\u00e8re de la D\u00e9fense nationale au titre de la politique de d\u00e9fense Protection, S\u00e9curit\u00e9, Engagement annonc\u00e9e en 2017.","highlights":[{"content":{"en":"The total 20-year capital spending envelope has increased by $51.5 billion since the last PBO report in 2022, from $163.3 to $214.8 billion.","fr":"L\u2019enveloppe totale des d\u00e9penses en capital sur 20 ans a augment\u00e9 de 51,5 milliards de dollars depuis le dernier rapport du directeur parlementaire du budget (DPB) en 2022, passant de 163,3 \u00e0 214,8 milliards de dollars."}},{"content":{"en":"New NORAD modernization projects contributed to this increase over the 20-year period studied.","fr":"Les nouveaux projets de modernisation du NORAD ont contribu\u00e9 \u00e0 cette augmentation au cours de la p\u00e9riode de 20 ans \u00e9tudi\u00e9e."}},{"content":{"en":"Some preexisting projects within the SSE envelope experienced delays and the re-profiling of near-term expenditures into later years.","fr":"Certains projets pr\u00e9existants inscrits dans le budget de la politique Protection, S\u00e9curit\u00e9, Engagement (PSE) ont connu des retards et les d\u00e9penses \u00e0 court terme ont \u00e9t\u00e9 report\u00e9es \u00e0 des ann\u00e9es ult\u00e9rieures."}},{"content":{"en":"A majority of the total expenditures, 62%, are planned for the latter half of the 20-year period of study. The previous report showed a near 50\/50 split of total expenditures between the first and second 10-year halves.","fr":"La majorit\u00e9 des d\u00e9penses totales, soit 62 %, sont pr\u00e9vues au cours de la seconde moiti\u00e9 de la p\u00e9riode d\u2019\u00e9tude de 20 ans. Le rapport pr\u00e9c\u00e9dent faisait \u00e9tat d\u2019une r\u00e9partition presque \u00e9gale des d\u00e9penses totales entre les deux p\u00e9riodes de 10 ans."}},{"content":{"en":"From 2017-18 to 2022-23, there was a cumulative shortfall nearing $12 billion between what DND spent on capital and what was originally planned under SSE.","fr":"De 2017-2018 \u00e0 2022-2023, il y avait un \u00e9cart d\u00e9ficitaire de pr\u00e8s de 12 milliards de dollars entre ce qu\u2019avait d\u00e9pens\u00e9 le MDN en immobilisations et ce qui \u00e9tait initialement pr\u00e9vu au titre de la politique PSE."}},{"content":{"en":"As in the previous report, increasing annual expenditures to levels never seen before in the latter part of the period increases concerns regarding the effect of inflation discounting the purchasing power of the SSE capital envelope.","fr":"Comme dans le rapport pr\u00e9c\u00e9dent, l\u2019augmentation des d\u00e9penses annuelles \u00e0 des niveaux jamais vus auparavant dans la derni\u00e8re partie de la p\u00e9riode suscite des craintes en raison de l\u2019effet de l\u2019inflation qui r\u00e9duit le pouvoir d\u2019achat associ\u00e9 \u00e0 l\u2019enveloppe des d\u00e9penses en capital de la politique PSE."}}]},"updated_at":"2024-02-28T19:40:52.000000Z","type":"RP","slug":"RP-2324-025-C--planned-capital-spending-under-canada-defence-policy-2024-update--depenses-capital-prevues-titre-politique-defense-canada-mise-jour-2024","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2324-025-C--planned-capital-spending-under-canada-defence-policy-2024-update--depenses-capital-prevues-titre-politique-defense-canada-mise-jour-2024","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2324-025-C--planned-capital-spending-under-canada-defence-policy-2024-update--depenses-capital-prevues-titre-politique-defense-canada-mise-jour-2024"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2324-025-C--planned-capital-spending-under-canada-defence-policy-2024-update--depenses-capital-prevues-titre-politique-defense-canada-mise-jour-2024","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2324-025-C--planned-capital-spending-under-canada-defence-policy-2024-update--depenses-capital-prevues-titre-politique-defense-canada-mise-jour-2024"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/8605cd9a403c2ce58502a9134a356cadf28632becc316a61a7b6f267f603b608"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/0bc6824d55c742d205f1adeb105f6ba11ba13c69228347f41ad4903dc8157f58"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1f4dafab7cf8087178544a876639ff288eb853d23bd7268e798fb789adb29da3","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/91ee935d75a2d2742ef24a092097cad24f264c772d0bbcb9caf4d059510cccc4","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/9630ffea65970d0caf055a4f2c2f3923359b1b4e10e1f51553d4170df45428ff","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4568ee733191c6702962327b58364d8abc6a9492942579a88ddcddd7888d940c","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d4b834ada3ed9276859ffdbc14c12659e80814bf8a530bf587d9faddbba749ee","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/da3d66c416df84679bd071e3166c88147d162b7a2cde2bbc22e5c42159f2a700","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a413f2d1672d406100aeaaca3a978ee98ce5b9768f68dd42bff0fc4f6d29154e","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4658c4d65b5a7021d30011e6dce3a227130776f8ec5e1c43049efac848062f2c"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6e23b3bcee5e80fd8592c9c03ecbdbd9609074b2653decaa3e9463d970a0790a","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/080455720b308abc6005e8f881ec6fcf99195291b392197f601f90c9614156df","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6f4b5f5e228ca132df0dee259eadba0af26844af233dc96d40acf04544cada99","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/02b523b2b7154e54f672cca8c349674a5f2bb5402bcdd1816dc0ab4afe299d34","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2d2ff6b82b4beb621579b86f3cf96b04ec22576503ee638eacc579cbc05eb1af","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4c8f4ce21e10d94623ef6abae32bab717eb3bc61b7041a8878d4c149c9da7262","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/830864b549f9752df4e42e448b210b94d16c28a2c6c30f828ade7c2a1974346c","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/982e6190e18672a961f0386d1121b1d782f283957cf873f77b63768f09b25121"}}},"bills":[],"files":[],"images":[],"bibtex":{"en":"@techreport{PBO-RP2324025C,\n author={Kho, Albert and Penney, Christopher},\n title={Planned Capital Spending under Canada\u2019s Defence Policy: 2024 Update},\n institution={The Office of the Parliamentary Budget Officer},\n year=2024,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2324025C,\n author={Kho, Albert and Penney, Christopher},\n title={D\\\u0027{e}penses en capital pr\\\u0027{e}vues au titre de la politique de d\\\u0027{e}fense du Canada : Mise \\`{a} jour de 2024},\n institution={Bureau du directeur parlementaire du budget},\n year=2024,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2324-018-S","is_published":"2023-11-02T12:57:05.000000Z","release_date":"2023-11-02T13:00:00.000000Z","title_en":"The Life Cycle Cost of Canada\u2019s F-35 Program \u2013 A Fiscal Analysis","title_fr":"Le co\u00fbt du cycle de vie du programme des F-35 du Canada \u2013 une analyse financi\u00e8re","internal_id":"RP-2324-018-S","metadata":{"abstract_en":"This report presents a cost analysis of Canada\u2019s F-35 program, including estimates for the Development, Acquisition, Operations and Sustainment, and Disposal phases.","abstract_fr":"Ce rapport pr\u00e9sente une analyse du co\u00fbt du programme des F-35 du Canada, y compris des estimations pour les \u00e9tapes D\u00e9veloppement, Acquisition, Exploitation et maintien en service, et D\u00e9mant\u00e8lement.","highlights":[{"content":{"en":"The total estimated cost of Canada\u2019s F-35 program is $73.9 billion.","fr":"Le co\u00fbt total du programme des F-35 du Canada est estim\u00e9 \u00e0 73,9 milliards de dollars."}},{"content":{"en":"Development phase costs are estimated at $0.2 billion.","fr":"Les co\u00fbts de l\u2019\u00e9tape D\u00e9veloppement sont estim\u00e9s \u00e0 0,2 milliard de dollars."}},{"content":{"en":"Acquisition phase costs are estimated at $19.8 billion.","fr":"Les co\u00fbts de l\u2019\u00e9tape Acquisition sont estim\u00e9s \u00e0 19,8 milliards de dollars."}},{"content":{"en":"Operations and Sustainment phase costs are estimated at 53.8 billion.","fr":"Les co\u00fbts de l\u2019\u00e9tape Exploitation et maintien en service sont estim\u00e9s \u00e0 53,8 milliards de dollars."}},{"content":{"en":"Disposal phase costs are estimated at $0.2 billion.","fr":"Les co\u00fbts de l\u2019\u00e9tape D\u00e9mant\u00e8lement sont estim\u00e9s \u00e0 0,2 milliard de dollars."}}]},"updated_at":"2023-11-02T12:57:05.000000Z","type":"RP","slug":"RP-2324-018-S--life-cycle-cost-canada-f-35-program-fiscal-analysis--cout-cycle-vie-programme-f-35-canada-une-analyse-financiere","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2324-018-S--life-cycle-cost-canada-f-35-program-fiscal-analysis--cout-cycle-vie-programme-f-35-canada-une-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2324-018-S--life-cycle-cost-canada-f-35-program-fiscal-analysis--cout-cycle-vie-programme-f-35-canada-une-analyse-financiere"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2324-018-S--life-cycle-cost-canada-f-35-program-fiscal-analysis--cout-cycle-vie-programme-f-35-canada-une-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2324-018-S--life-cycle-cost-canada-f-35-program-fiscal-analysis--cout-cycle-vie-programme-f-35-canada-une-analyse-financiere"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/34b45b0bb9aeeadfd2cc6ba7c6380521d6b4a051c21a87fd2b7dd51767323e89"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/faff3496d1d039605e4e581b7c9261f58ffd6b24d40d298ca98053fea83fec6b"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/31c625ae91a1c91e4ba7e9053b22f7fddf0c21b876fb8a91a3c7ed3a1d842ed0","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/85c1ee48d7bdbec633b4af0676a91d47fc1dadba050a5af40de0c441f8094a44","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/35db43d109751147d1b680b0f076e791e0f293fe3d010c637fce9eba10bd3289","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/dc48bdab24f6c1f2cfcfabd14a9a000c1c2706d7ec9a89786f22e1db5eb312f1","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/632b9eff2228c030ebc60c589c69c3992271ad1e883ec2a152853d57648bb088","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b1011129dd0830f6edcad7542dfe33c73181d6a36e427c82e1bf195e3bff6467","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3bd75bb2f0f7c07cd741f8e42e9424e3901b68f04bff14a48f4fe748fa826bf0","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/663ad6ee71c0d74036bfc192dea700e535603f887a5ba5217ecfdc06e6851542"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0b90c0ecf839d5bffd66ff4f9abaa0b60129203bb2f366fa463d109b22e35232","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2c1a8bd76717365494e643cb75060b73e1d0d31196cf1718657615f747e50c00","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/82aa088d1a92f9a2154f51490f4fa58fec8735b4749fceaea8f9234c0ed758a8","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/18a0189d4f46308da1c65691ccdf0688d068c49a032b41c9fba04af4bf3fc302","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/03ca098a54207dc52c46ffb453e680401fa6c93f57e0c005f306cf5bd9d7cbc6","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d06af0bf44d538218d7834be783e40811433025363294788f7863f7b2f3a1c96","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4f29704c6f4686383e511e6faced9f0f5250c9acef8a40a25893c29ac11603f0","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4e1e30ae629ebf577bd14967431c3100f52c246f91a20f481b744b2fbf5430ce"}}},"bills":[],"files":[],"images":[{"id":78,"created_at":"2023-11-01T14:09:34-04:00","updated_at":"2023-11-01T14:09:34-04:00","language":"en","type":"infographic","imageable_id":768,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/42efd61d70e387bc26f3e92347919f40c94e4825851003d742893cf0c7a6bc3c","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b3ff02e55c0ce954a453757f6dd4eb3a8654b6e5370da84b8d671594eb1cbd54","w1216_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0b977dc799579dcada70cd31fb18e7e76142e151fa6ead210219aecaeb47f265","w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/883462cd4b7cd4f4b17186586c9a4a5de44802f61c16e533ffb10c73888ac5f9","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5981a5191fc0e4bfd355a4b3f4498825e0a05aa7651f9047941f7ca1658ba7f5","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3704c7cfc6eebd9a284b101bec674d3b9ca6dcf7babff6960664ac69c24695eb","w2500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/afb58ae4baa886808d5e611c90ff48176dd688cfe64c3c686902cdbfdaac8200","w608_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/07f609f318ee693cc69390a17c0048f7db3ea87b2496565f88e1ac93c0f949fd","w608_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d78b86a38e7db8a9763c87b43f5b460e2112041f503acc7801becda15cea3e28","w1216_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4f9de25429c6224c4123f88bd6678355f66c557828afb52b5983620929f870b2","w704_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/dec36da0b4d356fe6e73c828dd7f9cd218670cf04b25ca13d504055f1435d8ec","w704_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1d7e5dc0b05f6d52d0792081d59565e7f3d532144bfc1720ecf1b0857db43d91","w1408_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1692072013837d28671093d4895db387d22788b5c5a6450fa87dfc3794302de7","w1408_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/69d51b4e544f038c74f0fb754444a72f0b8626db2ed9fffcfbfec92c795327cd","w960_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d5b103d655481e6568ad5cec9f6b0d88c70c9980d9f12df1748074ebe0edd5b7","w960_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3651ae11844bc59ff63e4b098582d5326c2f7366df3a745d4a9cc108b761bf5f","w1920_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/84c27cf00ad15b9b17177704eb81e7f18c016925738d98ffca1d26dad766f620","w1920_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/418bfb6df6230df93e26b813a0946b852df19135d34ed1c79e08b7606188714d"}},{"id":79,"created_at":"2023-11-01T14:10:13-04:00","updated_at":"2023-11-01T14:10:13-04:00","language":"fr","type":"infographic","imageable_id":768,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8fb4955d9cd52b9f865269ffca208f5508906136cb1105b26aa9ea851a3d4c83","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/571903616e0289b3777bc91aa8f7a9557d59a8bf54f9834ae22e042605ebbe05","w1216_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4e88574f7e3e6850064ca3f46d44f7734bd5b6dfa63b4bedc847aaf3e30288a3","w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6c28a0c3edf839c96c9e20dae233be1efa0fe454c187e5022c0006beb07cce18","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f06e7a5639f6fe382c18d0f1bfafe8a1cff1af083006b1945355cdbae29e8d3b","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/83f99b55749c496624d65edcc5b7b07ee1c1b2cdc0955f946ec251e68965bb23","w2500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4811fbbc26fb6a5020f18abf53e2d7f74767485c20230949e6d04a5f190ac891","w608_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3177d4bf938538211804b6413262117d10e203903a689487bedaeaa61b0eded6","w608_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c477f05003546fc171c058585ccd7dd07d6d89b11e919c24d9f154c5e46216db","w1216_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/195191f3a55b7d3849e3ef9bbfed378cdfc0ea733787cefabeb3054cf831d699","w704_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b52152cf36dba20092697f4737c0be223dee8124fada5993de716e4743d8852d","w704_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5321ac87a75b49aff2312eb5cdbb287023075a1c3e5d1dd4678f56ef0e1a1ba2","w1408_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6ceea54303b435d487f0d3962cd852218e2df495d18d747f1c6bc0d7489883bc","w1408_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4302e65cc873c1dd5c8a21987b5a60dec1a1bb99c8fa75a4396355dde4559799","w960_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a2eba781ca3aca06714e41b02509bf56b13f7c35eccc03fcd5561e829ee57078","w960_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5ce3eb36da1e086e7dc6ac8ccffb2209644f6b80ff2a23c6339bf59dddea73c5","w1920_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b89e585e6a753e65215b2f6e9ac5de0d4715b646b3087f2a08c3581796daa945","w1920_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d84267b8c18f49ebb165c4f5b86c7612d2df95e068eecc0b482a528338385b5d"}}],"bibtex":{"en":"@techreport{PBO-RP2324018S,\n author={Kho, Albert and Penney, Christopher and Busby, Carleigh},\n title={The Life Cycle Cost of Canada\u2019s F-35 Program - A Fiscal Analysis},\n institution={The Office of the Parliamentary Budget Officer},\n year=2023,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2324018S,\n author={Kho, Albert and Penney, Christopher and Busby, Carleigh},\n title={Le cout du cycle de vie du programme des F-35 du Canada - une analyse financi\\`{e}re},\n institution={Bureau du directeur parlementaire du budget},\n year=2023,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2324-010-S","is_published":"2023-09-26T12:57:09.000000Z","release_date":"2023-09-26T13:00:00.000000Z","title_en":"A Force Structure Model of Canada\u2019s Military: Costs and Personnel","title_fr":"Un mod\u00e8le de structure de forces de l\u2019arm\u00e9e canadienne : co\u00fbts et personnel","internal_id":"RP-2324-010-S","metadata":{"abstract_en":"This report details the development of a framework to address the costs of military capabilities and the potential trade-offs implied should a government policy require the adjustment of the structure of the Canadian Armed Forces.","abstract_fr":"Ce rapport d\u00e9taille l\u2019\u00e9laboration d\u2019un cadre permettant d\u2019aborder les co\u00fbts des capacit\u00e9s militaires et les compromis potentiels qu\u2019impliquerait une politique gouvernementale exigeant l\u2019ajustement de la structure des Forces arm\u00e9es canadiennes.","highlights":[{"content":{"en":"The PBO has developed a Force Structure Model of Canada\u2019s military. This consists of an independent estimation of annual personnel, operations, and sustainment costs of 21 identified military capabilities across all branches of the Canadian Armed Forces, supplemented with estimated personnel counts for each capability.","fr":"Le DPB a \u00e9labor\u00e9 un mod\u00e8le de structure de forces de l\u2019arm\u00e9e canadienne. Il s\u2019agit d\u2019une estimation ind\u00e9pendante des co\u00fbts annuels li\u00e9s au personnel, \u00e0 l\u2019exploitation et au soutien de 21 capacit\u00e9s militaires cibl\u00e9es dans toutes les directions des Forces arm\u00e9es canadiennes, compl\u00e9t\u00e9e par une estimation des effectifs pour chaque capacit\u00e9."}},{"content":{"en":"The model, which has been made publicly available and is hosted on the PBO website, allows for portfolio-level tradeoff analysis of the full suite of military capabilities, providing users the ability to examine changes in costs and personnel counts as the quantity of a given military capability is adjusted.","fr":"Le mod\u00e8le, qui a \u00e9t\u00e9 mis \u00e0 la disposition du public et qui est h\u00e9berg\u00e9 sur le site Web du DPB, permet d\u2019analyser les compromis \u00e0 l\u2019\u00e9chelle du portefeuille pour l\u2019ensemble des capacit\u00e9s militaires, en donnant aux utilisateurs la possibilit\u00e9 d\u2019examiner les changements dans les co\u00fbts et les effectifs lorsque les chiffres d\u2019une capacit\u00e9 militaire donn\u00e9e sont ajust\u00e9s."}}]},"updated_at":"2023-09-26T12:57:09.000000Z","type":"RP","slug":"RP-2324-010-S--force-structure-model-canada-military-costs-personnel--un-modele-structure-forces-armee-canadienne-couts-personnel","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2324-010-S--force-structure-model-canada-military-costs-personnel--un-modele-structure-forces-armee-canadienne-couts-personnel","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2324-010-S--force-structure-model-canada-military-costs-personnel--un-modele-structure-forces-armee-canadienne-couts-personnel"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2324-010-S--force-structure-model-canada-military-costs-personnel--un-modele-structure-forces-armee-canadienne-couts-personnel","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2324-010-S--force-structure-model-canada-military-costs-personnel--un-modele-structure-forces-armee-canadienne-couts-personnel"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/43e281bce11f872d669c0ae01438a1ba4434976b09c67f44d66299ea756b1459"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/20337b89fa0eb984bef1a54f9c2654db6e54cdfb2f5f58ae916fa79823a25651"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8c578312dda345e39fdddc9fc32687966e83bd6667fb755781711dfbe2327b07","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/9f7eccaf67eae57175118d732e988a86e2cf8b7bef85c10d5f142dd0220e380a","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c064c8875e75a869bbe4f97f823d1dc93023cf92e8dc7e6c9e8a9172b9b6d0a6","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/19ea852419884520de3d61859e667416f7417a4788f9fe540cd3dccc94e8ba4d","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/abfee44c6ef080b13520cd25d01512f70276f1b7398fcc67f4f884f31765f36d","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/301615d5bed53dc67bbc0de39399cc22aaf21aea6e3e3031a271fe1a6d7e1a4e","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ae44b83f68a30c852c9c000ffde17bb413ea1c26d1ff1fc11ec52ecb92ebc731","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e9fc25cdd1610c8c5f5285e31b52db555ae4cbe42f127f646c8d12f765b9d03e"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/49199c2d1004b5de3b4f2c7b7675a1da45a0632199c4db893965f131da4afb89","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5f10d0a0d6d33e11b01c0deaf3da3a9ca41f6d0be34c166edbc3176a8000877d","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/23a429e5f33c14b949e951210145ddeab5c31544135fa83a420733ff886b45cf","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/234167297a7070955f5c83c972b0f82c9fa0cf952a08dedb3934b86702bdd2f3","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fee2ba610188307b701bc95b8394489e4681c5af08aa93c6ffdc08df4fe6eb69","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/76854398bad31feedbe93b9346c7a10de49541a48547a385c3d9cccadf4f20ca","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d223e328c61cfc99e2a06e5acf85bbe06e5a363b92e7ceb69ca94ecc7d8eee13","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/61910386ffea08c95800478c5f7a3983fefc5e955ee5c51c44fcb0696bf42e63"}}},"bills":[],"files":[],"images":[],"bibtex":{"en":"@techreport{PBO-RP2324010S,\n author={Kho, Albert and Penney, Christopher and Solomon, Binyam},\n title={A Force Structure Model of Canada\u2019s Military: Costs and Personnel},\n institution={The Office of the Parliamentary Budget Officer},\n year=2023,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2324010S,\n author={Kho, Albert and Penney, Christopher and Solomon, Binyam},\n title={Un mod\\`{e}le de structure de forces de l\u2019arm\\\u0027{e}e canadienne : couts et personnel},\n institution={Bureau du directeur parlementaire du budget},\n year=2023,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2223-016-C","is_published":"2022-10-27T12:57:08.000000Z","release_date":"2022-10-27T13:00:00.000000Z","title_en":"The Life Cycle Cost of the Canadian Surface Combatants \u2014 A Fiscal Analysis","title_fr":"Le co\u00fbt du cycle de vie des navires de combat de surface canadiens \u2014 Analyse financi\u00e8re","internal_id":"RP-2223-016-C","metadata":{"abstract_en":"In response to a request by the House of Commons Standing Committee on Government Operations and Estimates (OGGO), this report presents a cost analysis of the Canadian Surface Combatants (CSC) program, including estimates for the Development, Acquisition, Operations and Sustainment, and Disposal phases of the fleet\u2019s life cycle.","abstract_fr":"En r\u00e9ponse \u00e0 une demande du Comit\u00e9 permanent des op\u00e9rations gouvernementales et des pr\u00e9visions budg\u00e9taires de la Chambre des communes (le Comit\u00e9 OGGO), ce rapport pr\u00e9sente une analyse du co\u00fbt du programme des navires de combat de surface canadiens (NCSC), y compris des estimations concernant les \u00e9tapes D\u00e9veloppement, Acquisition, Exploitation et maintien en service, et D\u00e9mant\u00e8lement du cycle de vie de la flotte.","highlights":[{"content":{"en":"The total life cycle cost of the CSC program is estimated to be $306.0 billion.","fr":"Le co\u00fbt total du cycle de vie du programme des NCSC est \u00e9valu\u00e9 \u00e0 306,0 milliards de dollars."}},{"content":{"en":"Development phase costs are estimated at $4.3 billion.","fr":"Les co\u00fbts de l\u2019\u00e9tape D\u00e9veloppement sont \u00e9valu\u00e9s \u00e0 4,3 milliards de dollars."}},{"content":{"en":"Acquisition phase costs are estimated at $80.2 billion.","fr":"Les co\u00fbts de l\u2019\u00e9tape Acquisition sont \u00e9valu\u00e9s \u00e0 80,2 milliards de dollars."}},{"content":{"en":"Operations and Sustainment phase costs are estimated at $219.8 billion.","fr":"Les co\u00fbts de l\u2019\u00e9tape Exploitation et maintien en service sont \u00e9valu\u00e9s \u00e0 219,8 milliards de dollars."}},{"content":{"en":"Disposal phase costs are estimated at $1.7 billion.","fr":"Les co\u00fbts de l\u2019\u00e9tape D\u00e9mant\u00e8lement sont \u00e9valu\u00e9s \u00e0 1,7 milliard de dollars."}}]},"updated_at":"2022-10-27T13:07:04.000000Z","type":"RP","slug":"RP-2223-016-C--life-cycle-cost-canadian-surface-combatants-fiscal-analysis--cout-cycle-vie-navires-combat-surface-canadien-analyse-financiere","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2223-016-C--life-cycle-cost-canadian-surface-combatants-fiscal-analysis--cout-cycle-vie-navires-combat-surface-canadien-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2223-016-C--life-cycle-cost-canadian-surface-combatants-fiscal-analysis--cout-cycle-vie-navires-combat-surface-canadien-analyse-financiere"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2223-016-C--life-cycle-cost-canadian-surface-combatants-fiscal-analysis--cout-cycle-vie-navires-combat-surface-canadien-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2223-016-C--life-cycle-cost-canadian-surface-combatants-fiscal-analysis--cout-cycle-vie-navires-combat-surface-canadien-analyse-financiere"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/747dfffc97de30adc19e38143f28b6e8334a0f7510c5c3a94c465a41c66cf504"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/a25341df5a2165e7ab5364bfc43491952286d843c550886f1c5c74900c45bb1a"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7d3a826f05891a903b01ce87e2945409039ee5c46df45dbf69f90c04f2f6b159","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f64f0b2153a38daf5a7adb7355348788d6a3014fdd9711942dca3757b82c0c1b","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/769669ca3fd1efbe7ae93b348f2ef0cf4836728f4df7bb230cc0292554c49b5e","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fe6ec469ce498e55cc5ba77179d2424fffe8eab07fdc0b9dfcc1a467ef614e9f","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/67b407a7f8b68a347a9a27e30df5144767ab96edc7ec7c03c228536503350b78","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0fc92f79b2a3cb5102786481887315faf0112de8af52f21bf4508a67e2b40195","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/be234766e2ffdaeb043a23bedb05f5aa4f521b0dfe3ff99a1fbe07af7a928082","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/48734a477a7ada5c12d24f1babd1ee5ed88ad5e9d12573628acecd17280d72e4"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f8b8ebd2aec827accd68cb4e17e6da06084612c317bbb975f2f7444fadc70c28","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5b1cb91a3c16cfd9bddc43663e4c51ac2fc6f6be77470efb9bba69860d15d1fc","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7086667760e5f165c06bb8138752db4d39a23d619fb38e07f4aba16c1ba03875","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c2ebb746cbf18772fc08f5eee2658d437ef2054182da585b5b674ca60e9aff59","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1318fc6e4dbe87fa134b0d711e4560c4a8d880a6592cde49d960482f1ca513ea","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/9925ed0bd426823c7477648585f02c19b5980ac165a49905bda37e0b17455780","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4fa433146d6bdc9acb394ef3c30e6cc97ad3653a9407f2947c02edeb948b084a","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/47a8d9aa2d0e624c20694e463ebb3e3769ab269724632f0daed25ba624a49cee"}}},"bills":[],"files":[],"images":[{"id":72,"created_at":"2023-06-06T13:33:20-04:00","updated_at":"2023-06-06T13:33:20-04:00","language":"en","type":"infographic","imageable_id":714,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2b969eb91a6a567fb9b477ffc0a3b71aecfffe202056f115f3e0484f0cb65da4","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/464ec2cb1004402c86f5abd7e9e5468611949c08bfb1e0445545d6cb81474d09","w1216_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fc607e3e8f13cbcc206cbc10c58f8d3c9f645f2a2e388a128d8cd0451bd23d63","w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/77122685c203b56bb957d19b680b90e53ad3dc124a70a8a03c8c3ca8f20d989d","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5765a187b725416288265a06acc8e065797cbd1249b9f1016edce0f3930f3cd9","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ef041c4466f9e266d90540853573ace5c81c852efd03ac13823fa45131032db3","w2500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f2bfde1757423c44939494d17f74fb7ce5f2e4752f6129324a7b8485526a762a","w608_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/43b4f743d10dfc33260155f0f7c69edd650f50d0c3607fd903da1e556eca9deb","w608_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1256d6a3032d35acf32b77478624bcb7361ebefa77faf9efe3c006a40802bfdd","w1216_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fa12d124a38e0b9ffe6a8c462a688f151147a317d2c86a139f8ef2022470a703","w704_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5ed8fdd3fdff26ce1133f1422b6106b9597632d04da431437ab7ff4c4c73bd58","w704_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/68ef7f57c4de8ea09b1fc545ab2ac299bdd97bf7e3b997a8b6e7723b30bc6e15","w1408_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b2fd4a9bcc0337e99a1a3cce3cbdacd4ed37417c8bb0bedd1f4c3d9f637a3f1d","w1408_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/919bb9c3b0268e5ebc5a2d2a5557bc9e835dd8e3a66413699ee793c2fdaef1c4","w960_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/02aca3a61fa2a2f578364d2bd6d00cc5cc2c30cc6f61b21e458ba85f47709378","w960_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/031a9eea7ce6150389f83a103f0abe3335714cf19d8f75a7717bcd37e7825dc8","w1920_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8042303c58fcefd075eb9048b7bb96e0707e28f117b57206c5b5d2002a32ac67","w1920_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e06907f9036a2aef866a67ec0d2fe1f4462e408f491e5f13918c100933dd70d3"}},{"id":73,"created_at":"2023-06-06T13:33:36-04:00","updated_at":"2023-06-06T13:33:36-04:00","language":"fr","type":"infographic","imageable_id":714,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ae74fc51ed9be8416055d615ea4cd6951b8f6484879b2d14b1389ef3630fb365","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/65c475584a090dc57d56adbb93ad5c740726077f0a60db7d23e2017a35a23f4a","w1216_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/52d428392d7eb73106c82900cef5220bc9fd046afedd4cadff3ea9d5e462661c","w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a117e0eb5cfbd53e59eb4c615553b3cc5c491cbb9e9cff096daf50f18e66c253","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/366c3a32b6a659f4422ccc1d502b602be9387ef4b5185ae21ba2f681b4deb4f3","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c8648458bc9c48930e96ab872c825fff33e946f02e4177428873a96c0ca8df5b","w2500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b55329959a5699aad3712da533f77c754523328a2e8547ea0ffd4d5cd97fc030","w608_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/085618c08a626f5096ad9ce4788bb7dc83c1cf380734e3065419ab0c4abe25d6","w608_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7ac6eb9448cd005d89633c5b75987a0fb3a17051a32849a112f1e7cab35cdd3b","w1216_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6dfcadac047ebcef62c0b9021cab401c92a9eb2639d8ffe62490853de19ab36a","w704_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/709cba6d089e46cbd2aa53bd8f5a18fe2ec229bdc34e248c52143888ac2c0aa3","w704_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ecfce38827a919c2c47df4361e3b14dfe720b8a63b1acbfa31c63b83e1fb591d","w1408_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c00485e46ddca6f2829c40bd42c7f3adc3cd1b55006a0bf6cb09624955639c0f","w1408_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/932ea35c446a7d8162cddaa918db4d2e0d46e2a700861bc21e61ff33e4f9d369","w960_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ea843aaf419fcb92c5b2b7b6ce0572f14e5c0a1bc014152d52fdeda1b31e2f3a","w960_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1153bb851af82bbb1fd82184a9f89556f9a6614c4b2e143cfa61d8cbadcdbccd","w1920_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/620b0deb58cb7e2523174c4caa126753341dca4ecaea1e7139b66f18c6e3a167","w1920_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/37b8d15ceaaa19036742e2000c871a6ce65d2ef6c49869949da28bd3ab0229e6"}}],"bibtex":{"en":"@techreport{PBO-RP2223016C,\n author={Busby, Carleigh and Kho, Albert and Penney, Christopher},\n title={The Life Cycle Cost of the Canadian Surface Combatants \\textemdash A Fiscal Analysis},\n institution={The Office of the Parliamentary Budget Officer},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2223016C,\n author={Busby, Carleigh and Kho, Albert and Penney, Christopher},\n title={Le cout du cycle de vie des navires de combat de surface canadiens \\textemdash Analyse financi\\`{e}re},\n institution={Bureau du directeur parlementaire du budget},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"is_published":"2022-09-15T19:02:11.000000Z","id":"BLOG-2223-002-C","internal_id":"BLOG-2223-002-C","release_date":"2022-09-15T13:00:00.000000Z","updated_at":"2022-09-15T19:02:11.000000Z","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/additional-analyses--analyses-complementaires\/BLOG-2223-002-C--canada-military-expenditure-nato-2-spending-target-additional-analysis--depenses-militaires-canada-objectif-depenses-2-otan-analyse-complementaire","preview":"https:\/\/www.pbo-dpb.ca\/en\/additional-analyses--analyses-complementaires\/BLOG-2223-002-C--canada-military-expenditure-nato-2-spending-target-additional-analysis--depenses-militaires-canada-objectif-depenses-2-otan-analyse-complementaire"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/additional-analyses--analyses-complementaires\/BLOG-2223-002-C--canada-military-expenditure-nato-2-spending-target-additional-analysis--depenses-militaires-canada-objectif-depenses-2-otan-analyse-complementaire","preview":"https:\/\/www.pbo-dpb.ca\/fr\/additional-analyses--analyses-complementaires\/BLOG-2223-002-C--canada-military-expenditure-nato-2-spending-target-additional-analysis--depenses-militaires-canada-objectif-depenses-2-otan-analyse-complementaire"}},"slug":"BLOG-2223-002-C--canada-military-expenditure-nato-2-spending-target-additional-analysis--depenses-militaires-canada-objectif-depenses-2-otan-analyse-complementaire","title_en":"Canada\u2019s Military Expenditure and the NATO 2% Spending Target: Additional Analysis","title_fr":"D\u00e9penses militaires du Canada et objectif de d\u00e9penses de 2% de l\u2019OTAN : Analyse compl\u00e9mentaire","abstract_en":"This Additional Analysis presents findings from new data on the Department of National Defence\u2019s calculation of total military expenditures between fiscal years 2014-15 and 2016-17.","abstract_fr":"Ce document pr\u00e9sente les conclusions tir\u00e9es de nouvelles donn\u00e9es sur le calcul des d\u00e9penses militaires totales effectu\u00e9 par le minist\u00e8re de la D\u00e9fense nationale pour les exercices 2014-2015 \u00e0 2016-2017.","files":[]}
{"id":"RP-2223-010-S","is_published":"2022-06-09T12:57:04.000000Z","release_date":"2022-06-09T13:00:00.000000Z","title_en":"Canada\u2019s Military Expenditure and the NATO 2% Spending Target","title_fr":"D\u00e9penses militaires du Canada et objectif de d\u00e9penses de 2 % de l\u2019OTAN","internal_id":"RP-2223-010-S","metadata":{"abstract_en":"This report presents fiscal analysis of achieving the North Atlantic Treaty Organization\u2019s 2% Defence Spending Target.","abstract_fr":"Ce rapport pr\u00e9sente une analyse financi\u00e8re concernant l\u2019atteinte de l\u2019objectif de d\u00e9penses de 2 % de l\u2019Organisation du Trait\u00e9 de l\u2019Atlantique Nord.","highlights":[{"content":{"en":"Canadian military expenditure has increased significantly between 2014 and 2021, rising approximately 40% in nominal terms across this period;","fr":"Les d\u00e9penses militaires du Canada ont consid\u00e9rablement augment\u00e9 entre 2014 et 2021, soit d\u2019environ 40 % en termes nominaux au cours de cette p\u00e9riode;"}},{"content":{"en":"PBO projections of military expenditure show an increase in total military spending from $36.3 billion in 2022-23 to $51.0 billion in 2026-27;","fr":"D\u2019apr\u00e8s les projections du DPB, le total des d\u00e9penses militaires passera de 36,3 milliards de dollars en 2022-2023 \u00e0 51,0 milliards de dollars en 2026-2027;"}},{"content":{"en":"Accordingly, Canada\u2019s military expenditure as a percentage of GDP is projected to increase from 1.33 percent to 1.59 percent over the same period;","fr":"Par cons\u00e9quent, les d\u00e9penses militaires du Canada en pourcentage du PIB devraient augmenter au cours de la m\u00eame p\u00e9riode, de 1,33 % \u00e0 1,59 %;"}},{"content":{"en":"In order for Canada to reach the 2% of GDP benchmark suggested by NATO, the government would need to spend between $13 and $18 billion more per year over the next 5 years.","fr":"Pour atteindre l\u2019objectif de 2 % du PIB recommand\u00e9 par l\u2019OTAN, il faudrait que le gouvernement du Canada d\u00e9pense de 13 \u00e0 18 milliards de dollars de plus par ann\u00e9e pendant les cinq prochaines ann\u00e9es."}}]},"updated_at":"2022-06-09T12:57:04.000000Z","type":"RP","slug":"RP-2223-010-S--canada-military-expenditure-nato-2-spending-target--depenses-militaires-canada-objectif-depenses-2-otan","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2223-010-S--canada-military-expenditure-nato-2-spending-target--depenses-militaires-canada-objectif-depenses-2-otan","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2223-010-S--canada-military-expenditure-nato-2-spending-target--depenses-militaires-canada-objectif-depenses-2-otan"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2223-010-S--canada-military-expenditure-nato-2-spending-target--depenses-militaires-canada-objectif-depenses-2-otan","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2223-010-S--canada-military-expenditure-nato-2-spending-target--depenses-militaires-canada-objectif-depenses-2-otan"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/2e61c150ee17ee7fc0594b3c01632c13ffb4dcb4d848b9f259a81a318d997a3c"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/34d3ab70d07fa45f516c877d503828c9fab929979f8ddf46bb3c7ad9b88cd43b"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b45eb52d7b3f5b398a4d61ecdca80fa10423edac818a1da3bd2a9d212779cb68","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3f4442f91547517aa48ec24442c5943b52a97be65006958ea80b12c6de406549","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c54db1f9243dc0872658757f7e3757e1883ca8a94de78f791e7068b5d1e6ce05","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8710683ab3bbe7fd1a75ce4cadd6c0cd0e717153f51662c201740b38fc739b0e","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/97ae06aa108d4ba6f50ffe2c9b13acc5bce2731d1095d081f6b4c4b285139ac2","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0fb8bbbea182f3955f9239bb0963945f0cebff0d7460d67b27f33f93407937d6","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/41281c757e0680d3e5221ee6f0fad8348f886d0ad728dc335eeff93eccbacfc6","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5f0fdee57ca74f30de8b2e30dd6e6d45d2a56edb2fd153a58073aff620a0bf58"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c788da5d2bb543ced323da099020225e90ce90fca725065357cd76f763e4f400","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1745d0de29b9617a851984ecff09813d6971202d0f24661f903ab38377564f4f","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/54aa25e87e0cd674e5c2c42f3365200b9779d7a97706653d781be9778cad7281","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/9221998b3c2a3a02b22b1e4d369503b88b6b52a0b53c04814a65ad03b083a13d","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4af9ddba54730a9cab8dd6d8cf093258bb1783999cdff98a2746712de3bdff37","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/07d1706d6b4447bb643cb980302b1588c92656927c26bd1ed3b3a3fbe3e35101","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0fdb6f74ea215eef165064291fd989f6bdd8b3cc43eb1bfddddc5f884d7511bb","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6f181ccd51594ec6a8973b639fddfe446fa41fdb89be9bd13068c1d242eddfbb"}}},"bills":[],"files":[],"images":[{"id":22,"created_at":"2022-06-08T11:45:23-04:00","updated_at":"2022-06-08T11:45:23-04:00","language":"en","type":"infographic","imageable_id":694,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1f44897e45afe578157103cf4f7556004bad019753d1d4648fec66f36f05c7a9","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6cc366a33e4127f5a7886d4955e8b23fa4995b46e39c52992b95ce574c90b8b3","w1216_png_optimized":null,"w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/beb0414de66c6bb5d1c664afd7c8c7ec417b2c350eace7fee4fb3a5e52a8b354","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0672a29950dd4d9d1d3d2158dca196ae35a5d9d9dcb509b9e28908ea5d021701","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/678f0ff71d04fb52222b61c076ed5d21196a20080d8685d62ebc1775b9973abe","w2500_png_optimized":null,"w608_png_optimized":null,"w608_webp":null,"w1216_webp":null,"w704_png_optimized":null,"w704_webp":null,"w1408_png_optimized":null,"w1408_webp":null,"w960_png_optimized":null,"w960_webp":null,"w1920_png_optimized":null,"w1920_webp":null}},{"id":23,"created_at":"2022-06-08T11:45:38-04:00","updated_at":"2022-06-08T11:45:38-04:00","language":"fr","type":"infographic","imageable_id":694,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/30c9d38f83b03ef2bce766ca55c1ce1a18b3e3ae4034ac9af1127d1e8eec836d","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d265d102fb6bba6a5f2508c2fba563e54fcfe2d4c64e4228c6a85b13a2115e0d","w1216_png_optimized":null,"w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/11afbd25af32b1f92994dd2fade09c07bd45a006e458a2c1591dc72d133e0f29","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f565bbe00e4eff3639286096fbebf6b74f12dc2de6335570f4777892dacc9df7","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c9293029bad78db83830dc3213f70e84b40a702911c48be1ccb60251bef74254","w2500_png_optimized":null,"w608_png_optimized":null,"w608_webp":null,"w1216_webp":null,"w704_png_optimized":null,"w704_webp":null,"w1408_png_optimized":null,"w1408_webp":null,"w960_png_optimized":null,"w960_webp":null,"w1920_png_optimized":null,"w1920_webp":null}}],"bibtex":{"en":"@techreport{PBO-RP2223010S,\n author={Penney, Christopher},\n title={Canada\u2019s Military Expenditure and the NATO 2% Spending Target},\n institution={The Office of the Parliamentary Budget Officer},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2223010S,\n author={Penney, Christopher},\n title={D\\\u0027{e}penses militaires du Canada et objectif de d\\\u0027{e}penses de 2 % de l\u2019OTAN},\n institution={Bureau du directeur parlementaire du budget},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2223-003-S","is_published":"2022-05-12T12:57:05.000000Z","release_date":"2022-05-12T13:00:00.000000Z","title_en":"The Industrial and Technological Benefits Policy: An Analysis of Contractor Obligations and Fulfillment","title_fr":"Politique des retomb\u00e9es industrielles et technologiques : analyse des obligations contractuelles et de leur ex\u00e9cution","internal_id":"RP-2223-003-S","metadata":{"abstract_en":"This report analyses transactions and investments made from 2015-2019 under the Industrial and Technological Benefits Policy for Canadian defence and security procurement, as administered by Innovation, Science and Economic Development Canada.","abstract_fr":"Ce rapport r\u00e9sume l\u2019analyse des engagements en mati\u00e8re d\u2019investissement pris au cours de la p\u00e9riode allant de 2015 \u00e0 2019 conform\u00e9ment \u00e0 la Politique des retomb\u00e9es industrielles et technologiques dans le domaine de l\u2019approvisionnement de d\u00e9fense et de s\u00e9curit\u00e9 du Canada, dont l\u2019application est assur\u00e9e par Innovation, Sciences et D\u00e9veloppement \u00e9conomique Canada.","highlights":[{"content":{"en":"ITB transactions over the 2015 to 2019 period total $18.3 billion in Canadian dollars.","fr":"Les transactions li\u00e9es aux RIT au cours de la p\u00e9riode de 2015 \u00e0 2019 totalisent 18,3 milliards de dollars canadiens."}},{"content":{"en":"Credit multipliers do not play a significant role in obligation fulfillment, accounting for only 0.8% of total transactions.","fr":"Les multiplicateurs de cr\u00e9dit ne contribuent pas beaucoup \u00e0 l\u2019ex\u00e9cution des obligations (ne repr\u00e9sentent que 0,8 % du total des transactions)."}},{"content":{"en":"\u201cIndirect\u201d transactions, which concern work unrelated to the procurement, account for nearly half (47.1%) of the total dollar value of transactions.","fr":"Les transactions \u00ab indirectes \u00bb, qui concernent des travaux sans lien avec l\u2019approvisionnement, repr\u00e9sentent pr\u00e8s de la moiti\u00e9 (47,1 %) de la valeur totale en dollars des transactions."}},{"content":{"en":"While Small and Medium Enterprises are engaged in over 50 percent of ITB transactions, they account for only 12.2% of total transaction amounts.","fr":"M\u00eame si les petites et moyennes entreprises participent \u00e0 plus de la moiti\u00e9 des transactions li\u00e9es aux RIT, elles ne comptent que pour 12,2 % de leur montant total."}},{"content":{"en":"Of the total dollar value in ITB transactions with large partner firms, Canadian-owned firms account for 30.8%.","fr":"Les entreprises appartenant \u00e0 des int\u00e9r\u00eats canadiens repr\u00e9sentent 30,8 % de la valeur totale en dollars des transactions li\u00e9es aux RIT avec de grandes entreprises partenaires."}}]},"updated_at":"2022-05-12T12:57:05.000000Z","type":"RP","slug":"RP-2223-003-S--industrial-technological-benefits-policy-an-analysis-contractor-obligations-fulfillment--politique-retombees-industrielles-technologiques-analyse-obligations-contractuelles-leur-execution","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2223-003-S--industrial-technological-benefits-policy-an-analysis-contractor-obligations-fulfillment--politique-retombees-industrielles-technologiques-analyse-obligations-contractuelles-leur-execution","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2223-003-S--industrial-technological-benefits-policy-an-analysis-contractor-obligations-fulfillment--politique-retombees-industrielles-technologiques-analyse-obligations-contractuelles-leur-execution"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2223-003-S--industrial-technological-benefits-policy-an-analysis-contractor-obligations-fulfillment--politique-retombees-industrielles-technologiques-analyse-obligations-contractuelles-leur-execution","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2223-003-S--industrial-technological-benefits-policy-an-analysis-contractor-obligations-fulfillment--politique-retombees-industrielles-technologiques-analyse-obligations-contractuelles-leur-execution"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/cdae8df20c63dd08820ba553a37151863d4e5112ae56def60eb2ca27fba302f0"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/a051717dda0837e7ce62b0be42457f5be3ac97d8dd68d9260a6118ac5619396d"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/10cd2757f0307770e125fc170544a40d862bd2bda2e14a33d181021d94997d4f","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/bdd0ed5df7135d9554038d4257995c45bdaced62b1a431a8bb2fc78774cc3333","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1858add0d0b49b8c91854e0efde71739deeae3e06c02b031f02b49ca2c80455b","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2f4a399d982844af3d4cc49b23ea598614bb933e24755b496f329a7679a61296","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a0698a2c4c37c1d5ff56209104607ecf0d8812abeae3349f93f1336788b838ba","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7cdaa2084a52a06c5b3a8d2b6c319e86d23a10a8dba4bd04659784d31d849b2f","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/da6f013e109c3e8fe781fb29172e66d99c8ac26fb36c146026e265b46ee64c52","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/59c5c05dbb69be60639c44bddc9d85295b003b478a73b3c2648e8fa7f52d808a"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a99e661f590ab8406835a57b7b933b5729a07274d6d8b87b26ba3d757f7cbc68","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2c389f45309083b31363909c1c976185f89d2aa98d9cd23a2dd8b60a7034da41","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/bd02ce758f90230b2d21c1d4342fe3c26ffeae9b0c0e86d0d47549c4d7675881","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/dd8ef88799f4cadcb28a027c704bc9d3105ae6741b41e340481694ef6ce379ad","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b49708cd9d577e10ee5436308f8a4fbc6bc124b12ec800b3275b0cda7527de1e","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d54446f6d943a09734a80e73f4ddfdfd4e2ecf00d119ba80495e68fc0777e755","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8ea4e0542d51cd6582b66ba4b8dacacc04bb5d255793a22140d27efe56379d0b","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/32265881fdead9e0b1ad868576a06ccb76d40771f37e767e3213b7abe5c291d5"}}},"bills":[],"files":[],"images":[],"bibtex":{"en":"@techreport{PBO-RP2223003S,\n author={Kho, Albert and Penney, Christopher},\n title={The Industrial and Technological Benefits Policy: An Analysis of Contractor Obligations and Fulfillment},\n institution={The Office of the Parliamentary Budget Officer},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2223003S,\n author={Kho, Albert and Penney, Christopher},\n title={Politique des retomb\\\u0027{e}es industrielles et technologiques : analyse des obligations contractuelles et de leur ex\\\u0027{e}cution},\n institution={Bureau du directeur parlementaire du budget},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2122-033-S","is_published":"2022-03-11T14:00:03.000000Z","release_date":"2022-03-11T14:00:00.000000Z","title_en":"Planned Capital Spending Under Strong, Secure, Engaged \u2013 Canada\u2019s Defence Policy: 2022 Update","title_fr":"D\u00e9penses en capital pr\u00e9vues au titre de la politique de d\u00e9fense du Canada Protection, S\u00e9curit\u00e9, Engagement : Mise \u00e0 jour de 2022","internal_id":"RP-2122-033-S","metadata":{"abstract_en":"This report analyses Department of National Defence planned capital spending under Strong, Secure, Engaged, announced in 2017, as of 2022.","abstract_fr":"Ce rapport analyse, en date de 2022, les d\u00e9penses en capital pr\u00e9vues du minist\u00e8re de la D\u00e9fense nationale au titre de la politique de d\u00e9fense Protection, S\u00e9curit\u00e9, Engagement annonc\u00e9e en 2017.","highlights":[{"content":{"en":"For the first time, all $164 billion earmarked for capital spending in the Strong, Secure, Engaged (SSE) envelope is reconciled.","fr":"Pour la premi\u00e8re fois, le rapprochement est maintenant effectu\u00e9 pour l\u2019int\u00e9gralit\u00e9 des 164 milliards de dollars de l\u2019enveloppe des d\u00e9penses en capital au titre de la politique Protection, S\u00e9curit\u00e9, Engagement (PSE)."}},{"content":{"en":"There are additional delays in planned spending, raising concerns on the sufficiency of the SSE envelope due to inflation.","fr":"En raison de l\u2019inflation, les retards additionnels dans les d\u00e9penses pr\u00e9vues font craindre que l\u2019enveloppe de la politique PSE soit insuffisante."}},{"content":{"en":"The highest planned annual capital expenditure increases from $12.6 billion to $16.3 billion.","fr":"Les d\u00e9penses en capital annuelles pr\u00e9vues les plus \u00e9lev\u00e9es sont pass\u00e9es de 12,6 \u00e0 16,3 milliards de dollars."}}]},"updated_at":"2022-03-11T14:00:03.000000Z","type":"RP","slug":"RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/c7a9b6d526158fb08858faa6012bbe61777939997eb35e4fd6c510e843f21dc1"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/5514acb3ab249bb02d2c6005cb22ea01ef3e7443f87744ab869e303458d17c5b"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0d894fc95e4773d61803a7d3dca6382838aa0f05957eb33ea59c6cfbf475bfcd","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ac0d1ac62d23ca41e266b30e2ef154f53c6de7ff34639711059003a0fe6763bb","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/46c26fa3b1e6dedc5c5275868f0d11be770b3ae7b8069ea7737710154a69e31a","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d4dc44604a9d9a84bdea0bf2efc69d51c5cb571840aa951419764249fa0abe1d","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ce9e92dc526ae22569b59bd0fd84d21efe5549b73010dc1dd1e7805411aeed5d","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7f147c10667345eabe0b12eecf3077bc5ec83baa5c00897439ced5bcedd19cd2","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fea2e406e93996e0eb77a05bcfa8d77b762d15d6a298aa9fbc39b1c7d26d2e4d","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8112eb19f5a920ebdb53830d2f946dc199c813ab2897be57be640a0fc2a8cdf0"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ad15bf28f62a338c9cfec5e90249a900de10779596bd5525a4d408497abf2346","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/650ff1d134ab945dcfac5bba6cf91eea26362bbf2cdfe6b79f166545f96fc17f","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/aecdb69c091d3b2db63b66999583867e44b78126271aa1232e6b75fb1a5ce94e","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ce580c886d31c9c8c0d514630080b6f71255b4b33dd72bd8b54e96e9056a9302","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a5d9de09f104d17f62f6f185aecc9d7fd21771856c9439153f4782b78fb3d43c","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/20efbd37d0b95f1924821ac0ce60a101d803fc94bd8324ed67581800d92484f3","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/dc95028e259f464dec4037c7edca049ea7288a71b527cfd2467331ed6009824c","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8918c335218165b7cd0b66a8579ffc4365abc4abf85c0c7aeb4080bbae827803"}}},"bills":[],"files":[{"id":2000,"created_at":"2022-03-17T13:12:36-04:00","updated_at":"2022-03-17T13:12:36-04:00","fileable_id":658,"fileable_type":"App\\Publication","mime":"application\/vnd.openxmlformats-officedocument.spreadsheetml.sheet","document_type":"supplementary_data","description_en":null,"description_fr":null,"bilingual":true,"urls":{"public":"https:\/\/pbo-dpb.s3.ca-central-1.amazonaws.com\/files--fichiers\/f2ed7a0ec5942baedaae365018e893df36478068312cd72fdc95051941c12040"},"verbose_document_type":{"en":"Supplementary Data","fr":"Donn\u00e9es Suppl\u00e9mentaires"},"extension":"xlsx"}],"images":[],"bibtex":{"en":"@techreport{PBO-RP2122033S,\n author={Kho, Albert and Penney, Christopher},\n title={Planned Capital Spending Under Strong, Secure, Engaged - Canada\u2019s Defence Policy: 2022 Update},\n institution={The Office of the Parliamentary Budget Officer},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2122033S,\n author={Kho, Albert and Penney, Christopher},\n title={D\\\u0027{e}penses en capital pr\\\u0027{e}vues au titre de la politique de d\\\u0027{e}fense du Canada Protection, S\\\u0027{e}curit\\\u0027{e}, Engagement : Mise \\`{a} jour de 2022},\n institution={Bureau du directeur parlementaire du budget},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2122-024-S","is_published":"2021-12-16T14:00:11.000000Z","release_date":"2021-12-16T14:00:00.000000Z","title_en":"The Polar Icebreaker Project: A Fiscal Analysis","title_fr":"Le projet de brise-glace polaire : analyse financi\u00e8re","internal_id":"RP-2122-024-S","metadata":{"abstract_en":"This report provides an independent cost estimate of the Development and Acquisition phases of the Polar Icebreaker Project. The Polar Icebreaker Project aims to replace the Canadian Coast Guard\u2019s existing fleet of heavy icebreakers with two new heavy icebreakers built to modern specifications.","abstract_fr":"Ce rapport pr\u00e9sente une estimation ind\u00e9pendante des co\u00fbts des phases de d\u00e9veloppement et d\u2019acquisition relatives au projet de brise-glaces polaires. Ce projet vise \u00e0 remplacer la flotte actuelle de brise-glaces lourds de la Garde c\u00f4ti\u00e8re canadienne par deux nouveaux brise-glaces lourds construits selon des sp\u00e9cifications modernes.","highlights":[{"content":{"en":"PBO estimates the total cost of the icebreaker project at $7.25 billion, inclusive of project management costs of $346 million, design costs of $820 million, and acquisition costs of $6.1 billion.","fr":"Le DPB estime le co\u00fbt total du projet de brise-glaces \u00e0 7,25 milliards de dollars, ce qui comprend les co\u00fbts de gestion de projet (346 millions de dollars), les co\u00fbts de conception (820 millions de dollars) et les co\u00fbts d\u2019acquisition (6,1 milliards de dollars)."}},{"content":{"en":"A sensitivity analysis suggests that delays of either one or two years in the start of the construction for both vessels at each partner shipyard would increase total project costs by $235 million or $472 million, respectively.","fr":"Selon une analyse de sensibilit\u00e9, si le d\u00e9but de la construction des deux navires dans chacun des chantiers navals partenaires tarde d\u2019un an ou deux, le co\u00fbt total du projet augmenterait de 235 millions de dollars ou de 472 millions de dollars, respectivement."}}]},"updated_at":"2021-12-16T14:00:11.000000Z","type":"RP","slug":"RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/d8c1cae885be92c964a0216e28e5ff1867e56bc0d63d14af361d24a6ef94cd81"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/6a0f37ba3708323bda7495d838a3f02d3bd21a50a36d20b4891090bea5c73123"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b22520bfd6aa583826bfb9b06f113705ed2c48b3ae39c9280c0fa996419ba60b","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/93f149344359e0394bff6458c62c25524cfe72457699e8d44850df25895ca086","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/be1a558c8c8d52e22a6f3dec37269055ac009906ab4214d643b1bc8c43647775","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3dfe8b5bbf51ff7c521be298137b50fa41660e41272aad76594aa1b0905d1a3a","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/41ed8dba62827ea3111a712401f3dbbb76ef9f5302e92b86f4238badfb08df89","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0ab51ce9010a1a9f356cf26507c37292780776d5e9890c3399e9ac427a8a3464","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e3a9e6505bb011a4e2e50f5e9fea75bfd60814fbfe20fcf04cfcf28051d68bd3","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2b620eb2a33296bbdde9819368deb1c9e847559c120fbafac30139e937d61876"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5b9a99f94814eea4254c23eb42e74a8bb1291228f4f4bcaf95ff7d22aa3ada42","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2df31f10f9554541e822498dfd430793bd707ccb766a5f65e997e07682737ade","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/53359cd6ab51faea12bb14a96f24d796541c26b2f011be3114436202edf56504","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0597e65760163e3bad91e79b74f3b794b98961b41428bdeff71b3579f109b3f5","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e8a161abb7dbc7e0764d25d9001b3927010768ca76a660442d9c70be41854f33","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1c3ee56752ac6d63ee2baa8d70630b0042cc03126232d7846f9f131bb6bc4c62","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/14ecef3fa59085ca4f1c0cccc152d7f94b82d31d72250f6dd5abd523746ece40","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e036826e5330ebc277206af521d88dd678b699fe7f090aef9bd589b5028b9da2"}}},"bills":[],"files":[{"id":1914,"created_at":"2022-02-09T14:20:01-05:00","updated_at":"2022-02-09T14:22:30-05:00","fileable_id":639,"fileable_type":"App\\Publication","mime":"application\/vnd.openxmlformats-officedocument.spreadsheetml.sheet","document_type":"supplementary_data","description_en":"Generic Distribution of Acquisition Costs","description_fr":"R\u00e9partition g\u00e9n\u00e9rique des co\u00fbts d\u0027acquisition","bilingual":false,"urls":{"en":{"public":"https:\/\/pbo-dpb.s3.ca-central-1.amazonaws.com\/files--fichiers\/6fa56cc9d5a3db6266b10b85c7df079d4b771faecd7db8af4c708b199085c5ba"},"fr":{"public":"https:\/\/pbo-dpb.s3.ca-central-1.amazonaws.com\/files--fichiers\/2c1d26e5fb876adfbb093e252cdcaca71aec054657c32ca78e6292d1cfc77706"}},"verbose_document_type":{"en":"Supplementary Data","fr":"Donn\u00e9es Suppl\u00e9mentaires"},"extension":"xlsx"}],"images":[],"bibtex":{"en":"@techreport{PBO-RP2122024S,\n author={Penney, Christopher and Elmarzougui, Eskandar},\n title={The Polar Icebreaker Project: A Fiscal Analysis},\n institution={The Office of the Parliamentary Budget Officer},\n year=2021,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2122024S,\n author={Penney, Christopher and Elmarzougui, Eskandar},\n title={Le projet de brise-glace polaire : analyse financi\\`{e}re},\n institution={Bureau du directeur parlementaire du budget},\n year=2021,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2021-040-C","is_published":"2021-02-24T14:00:05.000000Z","release_date":"2021-02-24T14:00:00.000000Z","title_en":"The Cost of Canada\u2019s Surface Combatants: 2021 Update and Options Analysis","title_fr":"Le co\u00fbt des navires de combat canadiens : Mise \u00e0 jour de 2021 et analyse des options","internal_id":"RP-2021-040-C","metadata":{"abstract_en":"In response to a request by the House of Commons Standing Committee on Government Operations and Estimates (OGGO), this report presents a costing analysis of building Canadian Surface Combatants (CSC) with the continuation of the Type 26, as well as the cost for two alternate designs: the FREMM and the Type 31e.","abstract_fr":"En r\u00e9ponse \u00e0 une demande du Comit\u00e9 permanent des op\u00e9rations gouvernementales et des pr\u00e9visions budg\u00e9taires de la Chambre des communes (le Comit\u00e9 OGGO), le pr\u00e9sent rapport pr\u00e9sente une analyse des co\u00fbts de la poursuite de la construction de navires de combat canadiens (NCC) de type 26, ainsi que du co\u00fbt de deux autres mod\u00e8les : la fr\u00e9gate europ\u00e9enne multi-mission (FREMM) et le navire de type 31e.","highlights":null},"updated_at":"2021-02-24T14:00:05.000000Z","type":"RP","slug":"RP-2021-040-C--cost-canada-surface-combatants-2021-update-options-analysis--cout-navires-combat-canadiens-mise-jour-2021-analyse-options","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2021-040-C--cost-canada-surface-combatants-2021-update-options-analysis--cout-navires-combat-canadiens-mise-jour-2021-analyse-options","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2021-040-C--cost-canada-surface-combatants-2021-update-options-analysis--cout-navires-combat-canadiens-mise-jour-2021-analyse-options"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2021-040-C--cost-canada-surface-combatants-2021-update-options-analysis--cout-navires-combat-canadiens-mise-jour-2021-analyse-options","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2021-040-C--cost-canada-surface-combatants-2021-update-options-analysis--cout-navires-combat-canadiens-mise-jour-2021-analyse-options"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/b2559c27bdd1bb8703d979c8a3dafc7ad10460acdd7d3b87c223e1b58bd09018"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/097b0da16f077128eaf721101751b8d1b67cf673e5aaacddc2111a8e4808408e"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4ec60993ee881bf02236e737a1151a8f51717673","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fb57b5cebcd600c2b9d7d6d13bb8a4c199e61c42","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8b495335a918953b012ecacb2efa73311224ec26","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4d946af8893559da1d73a7ca43a443bacf04e2ec","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5eb1c3043fc560b4be4e4d8d00c934f3e42a3a11","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2d861758f5bcc0921dc80f978a9cf4773f70350f","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/92b29e5090b44122fecb7d95570810d138de1074","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/20237144e7355258efcf3771796004e45ac1eec6"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/400acd8a8823763c43f87289ff9b0642db1a502f","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d6bef1bbe624b830eb0d19ea4d7b539ab7e69b6c","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d84940f61d3899da0d0c8ccebe1ab25cfaa43c7f","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fc32ccbcb8162a6ce3260f1723bdcb9bcf05547d","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/813ca9508a27b6db8f9f4dd62274bf55de3d5ab2","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2c7e7f563833cb6760021307a0114c0826a54af6","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/9420c2145eba0808c11a215b55d6e2237ead3082","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/65bc8cc1971087be4999b95e50a93428794aa617"}}},"bills":[],"files":[],"images":[{"id":39,"created_at":"2022-12-08T13:58:04-05:00","updated_at":"2022-12-08T13:58:04-05:00","language":"en","type":"infographic","imageable_id":79,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6e6db0c4f8287257c10958379b615fbb0054727b171d808c22a27888e74f41b8","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/122399fed36be1ef2fc9f0354d3b6da8511497d9e69caada574a2ac864b03e63","w1216_png_optimized":null,"w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3f3295b24556272bc91fee3ab76cf954ded3471980672eba49e56e0ee191cb99","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/bbd7b88067163b68a82daf016fe4df8728e1920e868cbe4d9ae48d1a1e97b909","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a59ea66f67909440550116b287c9798242c0ac471b514590434876d6064894b5","w2500_png_optimized":null,"w608_png_optimized":null,"w608_webp":null,"w1216_webp":null,"w704_png_optimized":null,"w704_webp":null,"w1408_png_optimized":null,"w1408_webp":null,"w960_png_optimized":null,"w960_webp":null,"w1920_png_optimized":null,"w1920_webp":null}},{"id":40,"created_at":"2022-12-08T13:58:18-05:00","updated_at":"2022-12-08T13:58:18-05:00","language":"fr","type":"infographic","imageable_id":79,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0d746857d88da7a66435c446564b15f5cf8a5ff786c2ce33810f0b94fa094868","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/24425f483153cdc395fb12af0ac417af0c6506a7bb14c2bccf6c6215f56263fa","w1216_png_optimized":null,"w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/181b73d56e1398fb46c0bb549b5efdc145a81bab19493146495fa7c64e0cd316","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a78c87569343c3d91592dfd53a868b3f1a0d1cb9676d4b0b2c9ee53bde22ab95","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/eabc4726bfc557be2665de49f86301eaf4efecbfce720fe51b70aca88ca95613","w2500_png_optimized":null,"w608_png_optimized":null,"w608_webp":null,"w1216_webp":null,"w704_png_optimized":null,"w704_webp":null,"w1408_png_optimized":null,"w1408_webp":null,"w960_png_optimized":null,"w960_webp":null,"w1920_png_optimized":null,"w1920_webp":null}}],"bibtex":{"en":"@techreport{PBO-RP2021040C,\n author={Busby, Carleigh and Penney, Christopher},\n title={The Cost of Canada\u2019s Surface Combatants: 2021 Update and Options Analysis},\n institution={The Office of the Parliamentary Budget Officer},\n year=2021,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2021040C,\n author={Busby, Carleigh and Penney, Christopher},\n title={Le cout des navires de combat canadiens : Mise \\`{a} jour de 2021 et analyse des options},\n institution={Bureau du directeur parlementaire du budget},\n year=2021,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2021-029-C","is_published":"2021-01-26T20:16:02.000000Z","release_date":"2020-11-17T14:00:00.000000Z","title_en":"The Joint Support Ship program and the MV Asterix: a Fiscal Analysis","title_fr":"Programme de navires de soutien interarm\u00e9es et NM Ast\u00e9rix : analyse financi\u00e8re","internal_id":"RP-2021-029-C","metadata":{"abstract_en":"In response to a request from the House of Commons Government Operations and Estimates Committee (OGGO), this report estimates the construction costs of the Joint Support Ship program to build two supply ships and costs of contracting converted commercial vessels named the MV Asterix and the Obelix to provide military support. This report also attempts to compare the two projects by incorporating additional project cost elements.\nOur independent point estimate of the construction cost is $2.4 billion, with an additional estimated $0.6 billion to account for budgetary contingency, producing a total of $3.0 billion. Accounting for the non-construction costs stated by the Department of National Defence, we estimate the total project cost of the JSS to be $4.1 billion, inclusive of provincial sales tax. \n\nThe total potential net cost of the government\u2019s contracting of the MV Asterix is $733 million, inclusive of provincial sales tax. We project that a five-year provision of service contract of the Obelix would cost the government $801 million, inclusive of any applicable taxes.\n\nAs the project costs of the JSS cannot be directly compared to the costs associated with the provision of service contract of the Asterix or any potential similar contract for the Obelix, we opt for a comparison of the JSS project to the cost of the purchase options for the Asterix and Obelix. Our calculations suggest that the Asterix and Obelix replenishment vessels could be obtained by the Government of Canada for a total of approximately $1.4 billion, as compared to our estimated $4.1 billion JSS project cost.","abstract_fr":"Le pr\u00e9sent rapport a \u00e9t\u00e9 produit en r\u00e9ponse \u00e0 une demande du Comit\u00e9 permanent des op\u00e9rations gouvernementales et des pr\u00e9visions budg\u00e9taires de la Chambre des communes (le Comit\u00e9 OGGO). Il propose une estimation des co\u00fbts du programme de navires de soutien interarm\u00e9es (NSI) pour la construction de deux navires ravitailleurs, ainsi que des co\u00fbts d\u2019un contrat de conversion des navires maritimes (NM) Ast\u00e9rix et Ob\u00e9lix pour fournir un appui militaire. Il tente \u00e9galement de comparer les deux projets en int\u00e9grant des \u00e9l\u00e9ments de co\u00fbt suppl\u00e9mentaires.\n\nNotre estimation ponctuelle ind\u00e9pendante des co\u00fbts de construction s\u2019\u00e9l\u00e8ve \u00e0 2,4 milliards de dollars, auxquels il faut ajouter un montant suppl\u00e9mentaire estim\u00e9 \u00e0 0,6 milliard de dollars pour couvrir d\u2019\u00e9ventuels impr\u00e9vus budg\u00e9taires, ce qui donne un total de 3,0 milliards de dollars.\n\nLe co\u00fbt total net \u00e9ventuel de la conclusion d\u2019un march\u00e9 gouvernemental pour le NM Ast\u00e9rix est de 733 millions de dollars, taxe de vente provinciale incluse. Nous avons fait des projections concernant un contrat de service de cinq ans pour l\u2019Ob\u00e9lix, et nous avons estim\u00e9 que cela co\u00fbterait au gouvernement 801 millions de dollars, toutes taxes comprises.\n\nComme les co\u00fbts du projet de NSI ne peuvent \u00eatre compar\u00e9s directement aux co\u00fbts associ\u00e9s au contrat de service concernant le NM Ast\u00e9rix ou \u00e0 tout autre contrat similaire \u00e9ventuel pour l\u2019Ob\u00e9lix, nous avons choisi de faire une comparaison des co\u00fbts du projet de NSI avec les co\u00fbts d\u2019option d\u2019achat du NM Ast\u00e9rix et de l\u2019Ob\u00e9lix. Nos calculs indiquent que le gouvernement du Canada devrait d\u00e9bourser environ 1,4 milliard de dollars au total pour acheter les navires de ravitaillement NM Ast\u00e9rix et Ob\u00e9lix, comparativement \u00e0 4,1 milliards de dollars, selon nos estimations, pour le projet de NSI.","highlights":null},"updated_at":"2021-01-26T20:16:02.000000Z","type":"RP","slug":"RP-2021-029-C--joint-support-ship-program-mv-asterix-fiscal-analysis--programme-navires-soutien-interarmees-nm-asterix-analyse-financiere","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2021-029-C--joint-support-ship-program-mv-asterix-fiscal-analysis--programme-navires-soutien-interarmees-nm-asterix-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2021-029-C--joint-support-ship-program-mv-asterix-fiscal-analysis--programme-navires-soutien-interarmees-nm-asterix-analyse-financiere"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2021-029-C--joint-support-ship-program-mv-asterix-fiscal-analysis--programme-navires-soutien-interarmees-nm-asterix-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2021-029-C--joint-support-ship-program-mv-asterix-fiscal-analysis--programme-navires-soutien-interarmees-nm-asterix-analyse-financiere"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/9d0e25fff86059f31c1ba5507e916fd8d81c695dda4327180df8336c27800d9f"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/10dcf661a1978057c84119baaca398dc522fd8d4cf0b9c8e5a98805228854e41"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e4a0162d6ec1c9a71693b1287917842c7d2127c0","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/822b0ebca254b904d4a5f0a0f68025463c2fb23f","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/230236dc4bcf2d41cff79bc28dc6a938b3802c73","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/84a67e0c37ed65e72c6f63f88f4aa37ce50dfb9b","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/59f54a598d2c111c70940e93c80c69934b736466","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/19c9e311e51fa2ee75dae3c8eefc426722ee89bd","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/df7e5e1f463a54195d699cb10ab960947ef9826d","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/87496587d33774a0e28adde60e3251961b9ce0d6"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/cc48b12453e9b30bbd54c292001f5fcad1f3c490","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a6f46f29a98ef931deaf33ea005769638b8f7a1f","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/9f048388b56db1cf3f963550c7996d903fd3b005","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5c0090c31d67cd261c7db84f4851fc2563ca2332","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1dc4567af048beb76efd1fdc1b928bfddd4e35e0","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3c1f37392c4a482febf9c04091a85a5b3750bc7b","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/473a37f33868e645b2c803c221363d2791463459","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/19824ac417e6f172a817cd1d079761816102acea"}}},"bills":[],"files":[],"images":[{"id":43,"created_at":"2022-12-08T14:08:46-05:00","updated_at":"2022-12-08T14:08:46-05:00","language":"en","type":"infographic","imageable_id":55,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/45ff07492e777a36b0f885d68ea7ba4f3567b9b7f4c4a46b1dce6637ba8b7d2a","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/25ce5d83e0bb5c0ebc2de8e88f9ef4eb0759eb626252ee961d60a42c31e9f1e5","w1216_png_optimized":null,"w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0e67cd9c4ff7363b46f5d381d8d8f0ae99874d033d10799b8f57f685b2ab0c2f","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4c86b32dce11c7044ea4c5ba908ae7ca95808ecfaf7904f560e79e9aeee49c29","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d96341fd5b79d45a3e9e299cbc64477f592d18591ddf184e787d426a5b9779c4","w2500_png_optimized":null,"w608_png_optimized":null,"w608_webp":null,"w1216_webp":null,"w704_png_optimized":null,"w704_webp":null,"w1408_png_optimized":null,"w1408_webp":null,"w960_png_optimized":null,"w960_webp":null,"w1920_png_optimized":null,"w1920_webp":null}},{"id":44,"created_at":"2022-12-08T14:08:58-05:00","updated_at":"2022-12-08T14:08:58-05:00","language":"fr","type":"infographic","imageable_id":55,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/39abd4b89dd331a394273795ed47c15ec6c9effe2ed8377d7da745905f601b2e","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3ba7f16ed5b9f0f239dd85571e9f94ade2c3ad200b5a21a0320b3565e1a6a344","w1216_png_optimized":null,"w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b6e01e4623f45536ac4295656e363b342b94aa81da3e919f6ab9663436a5f0bf","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fac69dd37f23551a6606a7c876a6189af7c8cd603c4d233e73af506472f488d6","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/613698cd34a7eb0d302a0deaaf0e21c2664532ef2844fd7e6dce1a5086620773","w2500_png_optimized":null,"w608_png_optimized":null,"w608_webp":null,"w1216_webp":null,"w704_png_optimized":null,"w704_webp":null,"w1408_png_optimized":null,"w1408_webp":null,"w960_png_optimized":null,"w960_webp":null,"w1920_png_optimized":null,"w1920_webp":null}}],"bibtex":{"en":"@techreport{PBO-RP2021029C,\n author={Busby, Carleigh and Penney, Christopher},\n title={The Joint Support Ship program and the MV Asterix: a Fiscal Analysis},\n institution={The Office of the Parliamentary Budget Officer},\n year=2020,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2021029C,\n author={Busby, Carleigh and Penney, Christopher},\n title={Programme de navires de soutien interarm\\\u0027{e}es et NM Ast\\\u0027{e}rix : analyse financi\\`{e}re},\n institution={Bureau du directeur parlementaire du budget},\n year=2020,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-1920-021","is_published":"2021-08-06T16:11:04.000000Z","release_date":"2019-06-21T13:00:00.000000Z","title_en":"The Cost of Canada\u2019s Surface Combatants: 2019 Update","title_fr":"Le co\u00fbt des navires de combat canadiens : Mise \u00e0 jour de 2019","internal_id":"RP-1920-021","metadata":{"abstract_en":"This report provides an updated cost estimate of the Canadian Surface Combatant (CSC) program from the 2017 PBO report, \u201cThe Cost of Canada\u2019s Surface Combatants.\u201d At the time of the previous cost analysis, the government had not yet selected a design for the new generation of warships. This update considers characteristics specific to the Type 26 design chosen by the government while incorporating updated information on the project\u2019s timeline.","abstract_fr":"Ce rapport est une mise \u00e0 jour de l\u2019estimation du co\u00fbt du programme des navires de combat canadiens (NCC) figurant dans le rapport de 2017 du DPB intitul\u00e9 Le co\u00fbt des navires de combat canadiens. Au moment de l\u2019analyse des co\u00fbts pr\u00e9c\u00e9dente, le gouvernement n\u2019avait pas encore choisi de mod\u00e8le pour la prochaine g\u00e9n\u00e9ration de navires de guerre. Cette mise \u00e0 jour tient compte des caract\u00e9ristiques propres au Type 26 choisi par le gouvernement, de m\u00eame que de renseignements actualis\u00e9s sur l\u2019\u00e9ch\u00e9ancier du projet.","highlights":null},"updated_at":"2021-08-06T16:12:46.000000Z","type":"RP","slug":"RP-1920-021--cost-canada-surface-combatants-2019-update--cout-navires-combat-canadiens-mise-jour-2019","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-1920-021--cost-canada-surface-combatants-2019-update--cout-navires-combat-canadiens-mise-jour-2019","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-1920-021--cost-canada-surface-combatants-2019-update--cout-navires-combat-canadiens-mise-jour-2019"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-1920-021--cost-canada-surface-combatants-2019-update--cout-navires-combat-canadiens-mise-jour-2019","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-1920-021--cost-canada-surface-combatants-2019-update--cout-navires-combat-canadiens-mise-jour-2019"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/fa5348077353f5f41f0291aabf85815c50b43555ca4940cea6eeece3936e6ebf"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/35de1c1e5c88b1e0db8ac4071a036fdaccf9335acb52e8d98af2f19970266667"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/339342b0bed6091a70c61c055903ffe318b738c89b5b66534767b0d81b229752","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6e2224cc7ba62ffb046179cd9d5536f7a2f084bd2ab5d2ebcb84a40a337cd705","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8d917599aa683e82f3453469ece9fda77c72144a6f8724eacf646cdc21533e4f","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/54b263051adb854c5139ab985a29d5deda81b224951a4d47e646c7c8265e4b55","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/4761a95c42929b74dd5918896ef70921466abcda111a487105b21733630da4ea","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b2e409ad80669956a76b088dcc92acca8d39de846c997782ef85540f3de5f1e1","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0afc8ad61857e124f5550ad1ab0a596bb6426319ee16fbd671a1acf645eb348d","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d81aa57738a7a6e8154ed01a25f8380da07478c8e925445fbe8c813658028ece"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e70bd9268c8458a15e5c8ac6afc2146a5cb67644afdc0967e013446c119b1758","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7a9049d6453afbc98ebe312e916c11a99c867583e1c9eff94463593c5feee48e","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f81356449c8fe465d1524667934de17799789541c7495b9b1ac0b2487b3bef39","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6416e46a97a28c0d64f929ec1980707a591977af0c6078719c888cd4e020a34a","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e2ce7d552152a36057960a735f8def29e6a3e2fd8338ff4abe3acc94eb588212","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1117777089136f3f046213afaac05fb7ec8607b01a6b8db8c23befade5adc405","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2cb9e1439c7da55e223c19ca1b1d36d76a8248b440e1abb6abd18ae20d15751f","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7e0ccad3e967423374050545f546936effc30d7b9601c4b4ac0cb4a11391ba97"}}},"bills":[],"files":[],"images":[],"bibtex":{"en":"@techreport{PBO-RP1920021,\n author={MacPhee, Sarah and Penney, Christopher},\n title={The Cost of Canada\u2019s Surface Combatants: 2019 Update},\n institution={The Office of the Parliamentary Budget Officer},\n year=2019,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP1920021,\n author={MacPhee, Sarah and Penney, Christopher},\n title={Le cout des navires de combat canadiens : Mise \\`{a} jour de 2019},\n institution={Bureau du directeur parlementaire du budget},\n year=2019,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-1819-397","is_published":"2021-06-21T17:47:37.000000Z","release_date":"2019-02-28T14:00:00.000000Z","title_en":"Fiscal Analysis of the Interim F-18 Aircraft","title_fr":"Analyse financi\u00e8re des chasseurs F-18 temporaires","internal_id":"RP-1819-397","metadata":{"abstract_en":"This report presents a fiscal analysis of the Government of Canada\u2019s purchase of 18 used F-18 aircraft from Australia.","abstract_fr":"Le pr\u00e9sent rapport renferme une analyse financi\u00e8re de l\u2019achat, par le gouvernement du Canada, de 18 chasseurs F-18 d\u2019occasion de l\u2019Australie.","highlights":null},"updated_at":"2021-06-21T17:58:35.000000Z","type":"RP","slug":"RP-1819-397--fiscal-analysis-of-the-interim-f-18--analyse-financiere-des-chasseurs-f-18-temporaires","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-1819-397--fiscal-analysis-of-the-interim-f-18--analyse-financiere-des-chasseurs-f-18-temporaires","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-1819-397--fiscal-analysis-of-the-interim-f-18--analyse-financiere-des-chasseurs-f-18-temporaires"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-1819-397--fiscal-analysis-of-the-interim-f-18--analyse-financiere-des-chasseurs-f-18-temporaires","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-1819-397--fiscal-analysis-of-the-interim-f-18--analyse-financiere-des-chasseurs-f-18-temporaires"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/cb497c8c868f3197a32528f55a2fecf96d30838866e59e65ae37ee487f529426"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/8163f6164c6264f07ff6c595fe5c40d4c8d1eeaa3f74ef2ffb2f9d192b3c1a0c"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a24c1dfb1643e8d9c0e699a8c68c5594245a9732d60c9b48552d53026d28a9b2","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f5967d0840bb929b105846227c1987e0935d725a0be8068fd84c5a33d479a428","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/031b16d45710e6809250ff45d8a2f128212766aae9424eb96719d34b2ff7d65d","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2948e02ba86818bcfb03839efbf8808089c59fad2a2381ab0f62085ea4a739fa","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e3b316285434dd0f8dd08adadae8335cefbed98935e1911354282ab26b8cfd48","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/01ff745c4b38b091913fb6c849e02dd3b710ace30f9e1c0827d9f9ca7ad56f2a","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a31c031efa32b083a8274e57e1ae9176ee868ea3371842bbcf0346d0c78f7216","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/056469bcf4e00826170674732dc26f59ddf128ec2af4149a20db4ddb189d6e01"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ee2b8acf268be0be634224aa6602fe092cf2f2d1fe95c824f7e1889ca30dfc72","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d330c9d89c9c7ee903796d668b209968cd723574ac0032ce56bd803d49ad0fdb","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/f6bf0f2fd2872f38fd391da993a26febff72c7ae8dab70c6778c2def3103ab59","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6fadd4508f971d150d181ed880f1b78bbaa7f3eb18f038c7e872420f1c796dd0","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/30e3f675cdd982ff3e74cbe9e0f376232a8db0ebe09fb806db7f47779b792d90","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/c73c1b80f3497742daf0ec59e7d5da93b535098fedced5d98b912931bc867039","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/59e9301d4d31d40eca50f110877bd46b4f54e525e0b04c4729702de8bffba76f","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7170b8299b19baa31176f6209e93c6f78af1eff7fd80d50dec502c2016fac446"}}},"bills":[],"files":[],"images":[{"id":64,"created_at":"2023-01-27T15:48:29-05:00","updated_at":"2023-01-27T15:48:29-05:00","language":"en","type":"infographic","imageable_id":453,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/400de8687f0e95d6d70f5919bea9a7d2ec75d3b8fc0f362df20e15b4bef28d25","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/dd4e4804eb61f66b3637a8d7540027090862b2f2fd2f01aae97ee372f7a4d1dd","w1216_png_optimized":null,"w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0f213ba211ea3b12783879b1679e25a5881df5673f0ab3b9063cbe6a011a99c5","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5413b8922f24dc353b167b9ca1fc40529fed5d503c379828cac12b58041603ad","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/6728cbdf20836d43fbfeb3b7ded337d2a142002c0d70254736aca646ac620b97","w2500_png_optimized":null,"w608_png_optimized":null,"w608_webp":null,"w1216_webp":null,"w704_png_optimized":null,"w704_webp":null,"w1408_png_optimized":null,"w1408_webp":null,"w960_png_optimized":null,"w960_webp":null,"w1920_png_optimized":null,"w1920_webp":null}},{"id":65,"created_at":"2023-01-27T15:48:38-05:00","updated_at":"2023-01-27T15:48:38-05:00","language":"fr","type":"infographic","imageable_id":453,"imageable_type":"App\\Publication","urls":{"sq192_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1fd94fe480595856c606f5637be2935ac173e760e07c538d2bf5339751428e46","h500_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0ef803e94af95c3b129554c78e3fc046d5742ae4201273968c0f05c6f0651add","w1216_png_optimized":null,"w1275_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e275b046e6add60d22565f585ec8cb71a6a50a499923e0e37f1ce0f57bf12b91","w2550_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/bc305befdeea2d850aefa5922288411c7a91d0a7f3234625ffdd366c4268a677","w2550_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/10c5cc7ef78e6a0d17085e7b3e00b6a88609bf0777b40d142fb9c47cdd7013ab","w2500_png_optimized":null,"w608_png_optimized":null,"w608_webp":null,"w1216_webp":null,"w704_png_optimized":null,"w704_webp":null,"w1408_png_optimized":null,"w1408_webp":null,"w960_png_optimized":null,"w960_webp":null,"w1920_png_optimized":null,"w1920_webp":null}}],"bibtex":{"en":"@techreport{PBO-RP1819397,\n author={Penney, Christopher},\n title={Fiscal Analysis of the Interim F-18 Aircraft},\n institution={The Office of the Parliamentary Budget Officer},\n year=2019,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP1819397,\n author={Penney, Christopher},\n title={Analyse financi\\`{e}re des chasseurs F-18 temporaires},\n institution={Bureau du directeur parlementaire du budget},\n year=2019,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2122-033-S","is_published":"2022-03-11T14:00:03.000000Z","release_date":"2022-03-11T14:00:00.000000Z","title_en":"Planned Capital Spending Under Strong, Secure, Engaged \u2013 Canada\u2019s Defence Policy: 2022 Update","title_fr":"D\u00e9penses en capital pr\u00e9vues au titre de la politique de d\u00e9fense du Canada Protection, S\u00e9curit\u00e9, Engagement : Mise \u00e0 jour de 2022","internal_id":"RP-2122-033-S","metadata":{"abstract_en":"This report analyses Department of National Defence planned capital spending under Strong, Secure, Engaged, announced in 2017, as of 2022.","abstract_fr":"Ce rapport analyse, en date de 2022, les d\u00e9penses en capital pr\u00e9vues du minist\u00e8re de la D\u00e9fense nationale au titre de la politique de d\u00e9fense Protection, S\u00e9curit\u00e9, Engagement annonc\u00e9e en 2017.","highlights":[{"content":{"en":"For the first time, all $164 billion earmarked for capital spending in the Strong, Secure, Engaged (SSE) envelope is reconciled.","fr":"Pour la premi\u00e8re fois, le rapprochement est maintenant effectu\u00e9 pour l\u2019int\u00e9gralit\u00e9 des 164 milliards de dollars de l\u2019enveloppe des d\u00e9penses en capital au titre de la politique Protection, S\u00e9curit\u00e9, Engagement (PSE)."}},{"content":{"en":"There are additional delays in planned spending, raising concerns on the sufficiency of the SSE envelope due to inflation.","fr":"En raison de l\u2019inflation, les retards additionnels dans les d\u00e9penses pr\u00e9vues font craindre que l\u2019enveloppe de la politique PSE soit insuffisante."}},{"content":{"en":"The highest planned annual capital expenditure increases from $12.6 billion to $16.3 billion.","fr":"Les d\u00e9penses en capital annuelles pr\u00e9vues les plus \u00e9lev\u00e9es sont pass\u00e9es de 12,6 \u00e0 16,3 milliards de dollars."}}]},"updated_at":"2022-03-11T14:00:03.000000Z","type":"RP","slug":"RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2122-033-S--planned-capital-spending-under-strong-secure-engaged-canada-defence-policy-2022-update--depenses-capital-prevues-titre-politique-defense-canada-protection-securite-engagement-mise-jour-202"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/c7a9b6d526158fb08858faa6012bbe61777939997eb35e4fd6c510e843f21dc1"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/5514acb3ab249bb02d2c6005cb22ea01ef3e7443f87744ab869e303458d17c5b"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0d894fc95e4773d61803a7d3dca6382838aa0f05957eb33ea59c6cfbf475bfcd","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ac0d1ac62d23ca41e266b30e2ef154f53c6de7ff34639711059003a0fe6763bb","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/46c26fa3b1e6dedc5c5275868f0d11be770b3ae7b8069ea7737710154a69e31a","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/d4dc44604a9d9a84bdea0bf2efc69d51c5cb571840aa951419764249fa0abe1d","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ce9e92dc526ae22569b59bd0fd84d21efe5549b73010dc1dd1e7805411aeed5d","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/7f147c10667345eabe0b12eecf3077bc5ec83baa5c00897439ced5bcedd19cd2","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/fea2e406e93996e0eb77a05bcfa8d77b762d15d6a298aa9fbc39b1c7d26d2e4d","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8112eb19f5a920ebdb53830d2f946dc199c813ab2897be57be640a0fc2a8cdf0"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ad15bf28f62a338c9cfec5e90249a900de10779596bd5525a4d408497abf2346","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/650ff1d134ab945dcfac5bba6cf91eea26362bbf2cdfe6b79f166545f96fc17f","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/aecdb69c091d3b2db63b66999583867e44b78126271aa1232e6b75fb1a5ce94e","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/ce580c886d31c9c8c0d514630080b6f71255b4b33dd72bd8b54e96e9056a9302","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/a5d9de09f104d17f62f6f185aecc9d7fd21771856c9439153f4782b78fb3d43c","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/20efbd37d0b95f1924821ac0ce60a101d803fc94bd8324ed67581800d92484f3","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/dc95028e259f464dec4037c7edca049ea7288a71b527cfd2467331ed6009824c","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/8918c335218165b7cd0b66a8579ffc4365abc4abf85c0c7aeb4080bbae827803"}}},"bills":[],"files":[{"id":2000,"created_at":"2022-03-17T13:12:36-04:00","updated_at":"2022-03-17T13:12:36-04:00","fileable_id":658,"fileable_type":"App\\Publication","mime":"application\/vnd.openxmlformats-officedocument.spreadsheetml.sheet","document_type":"supplementary_data","description_en":null,"description_fr":null,"bilingual":true,"urls":{"public":"https:\/\/pbo-dpb.s3.ca-central-1.amazonaws.com\/files--fichiers\/f2ed7a0ec5942baedaae365018e893df36478068312cd72fdc95051941c12040"},"verbose_document_type":{"en":"Supplementary Data","fr":"Donn\u00e9es Suppl\u00e9mentaires"},"extension":"xlsx"}],"images":[],"bibtex":{"en":"@techreport{PBO-RP2122033S,\n author={Kho, Albert and Penney, Christopher},\n title={Planned Capital Spending Under Strong, Secure, Engaged - Canada\u2019s Defence Policy: 2022 Update},\n institution={The Office of the Parliamentary Budget Officer},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2122033S,\n author={Kho, Albert and Penney, Christopher},\n title={D\\\u0027{e}penses en capital pr\\\u0027{e}vues au titre de la politique de d\\\u0027{e}fense du Canada Protection, S\\\u0027{e}curit\\\u0027{e}, Engagement : Mise \\`{a} jour de 2022},\n institution={Bureau du directeur parlementaire du budget},\n year=2022,\n \n address = \u0022Ottawa, ON\u0022\n}"}}
{"id":"RP-2122-024-S","is_published":"2021-12-16T14:00:11.000000Z","release_date":"2021-12-16T14:00:00.000000Z","title_en":"The Polar Icebreaker Project: A Fiscal Analysis","title_fr":"Le projet de brise-glace polaire : analyse financi\u00e8re","internal_id":"RP-2122-024-S","metadata":{"abstract_en":"This report provides an independent cost estimate of the Development and Acquisition phases of the Polar Icebreaker Project. The Polar Icebreaker Project aims to replace the Canadian Coast Guard\u2019s existing fleet of heavy icebreakers with two new heavy icebreakers built to modern specifications.","abstract_fr":"Ce rapport pr\u00e9sente une estimation ind\u00e9pendante des co\u00fbts des phases de d\u00e9veloppement et d\u2019acquisition relatives au projet de brise-glaces polaires. Ce projet vise \u00e0 remplacer la flotte actuelle de brise-glaces lourds de la Garde c\u00f4ti\u00e8re canadienne par deux nouveaux brise-glaces lourds construits selon des sp\u00e9cifications modernes.","highlights":[{"content":{"en":"PBO estimates the total cost of the icebreaker project at $7.25 billion, inclusive of project management costs of $346 million, design costs of $820 million, and acquisition costs of $6.1 billion.","fr":"Le DPB estime le co\u00fbt total du projet de brise-glaces \u00e0 7,25 milliards de dollars, ce qui comprend les co\u00fbts de gestion de projet (346 millions de dollars), les co\u00fbts de conception (820 millions de dollars) et les co\u00fbts d\u2019acquisition (6,1 milliards de dollars)."}},{"content":{"en":"A sensitivity analysis suggests that delays of either one or two years in the start of the construction for both vessels at each partner shipyard would increase total project costs by $235 million or $472 million, respectively.","fr":"Selon une analyse de sensibilit\u00e9, si le d\u00e9but de la construction des deux navires dans chacun des chantiers navals partenaires tarde d\u2019un an ou deux, le co\u00fbt total du projet augmenterait de 235 millions de dollars ou de 472 millions de dollars, respectivement."}}]},"updated_at":"2021-12-16T14:00:11.000000Z","type":"RP","slug":"RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere","permalinks":{"en":{"website":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/en\/publications\/RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere"},"fr":{"website":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere","preview":"https:\/\/www.pbo-dpb.ca\/fr\/publications\/RP-2122-024-S--polar-icebreaker-project-fiscal-analysis--projet-brise-glace-polaire-analyse-financiere"}},"artifacts":{"main":{"en":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/d8c1cae885be92c964a0216e28e5ff1867e56bc0d63d14af361d24a6ef94cd81"},"fr":{"public":"https:\/\/distribution-a617274656661637473.pbo-dpb.ca\/6a0f37ba3708323bda7495d838a3f02d3bd21a50a36d20b4891090bea5c73123"}}},"coverpages":{"distribution":{"fr":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/b22520bfd6aa583826bfb9b06f113705ed2c48b3ae39c9280c0fa996419ba60b","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/93f149344359e0394bff6458c62c25524cfe72457699e8d44850df25895ca086","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/be1a558c8c8d52e22a6f3dec37269055ac009906ab4214d643b1bc8c43647775","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/3dfe8b5bbf51ff7c521be298137b50fa41660e41272aad76594aa1b0905d1a3a","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/41ed8dba62827ea3111a712401f3dbbb76ef9f5302e92b86f4238badfb08df89","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0ab51ce9010a1a9f356cf26507c37292780776d5e9890c3399e9ac427a8a3464","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e3a9e6505bb011a4e2e50f5e9fea75bfd60814fbfe20fcf04cfcf28051d68bd3","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2b620eb2a33296bbdde9819368deb1c9e847559c120fbafac30139e937d61876"},"en":{"small":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/5b9a99f94814eea4254c23eb42e74a8bb1291228f4f4bcaf95ff7d22aa3ada42","large":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/2df31f10f9554541e822498dfd430793bd707ccb766a5f65e997e07682737ade","h150_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/53359cd6ab51faea12bb14a96f24d796541c26b2f011be3114436202edf56504","h150_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/0597e65760163e3bad91e79b74f3b794b98961b41428bdeff71b3579f109b3f5","h300_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e8a161abb7dbc7e0764d25d9001b3927010768ca76a660442d9c70be41854f33","h300_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/1c3ee56752ac6d63ee2baa8d70630b0042cc03126232d7846f9f131bb6bc4c62","h600_png_optimized":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/14ecef3fa59085ca4f1c0cccc152d7f94b82d31d72250f6dd5abd523746ece40","h600_webp":"https:\/\/distribution-i696d61676573.pbo-dpb.ca\/e036826e5330ebc277206af521d88dd678b699fe7f090aef9bd589b5028b9da2"}}},"bills":[],"files":[{"id":1914,"created_at":"2022-02-09T14:20:01-05:00","updated_at":"2022-02-09T14:22:30-05:00","fileable_id":639,"fileable_type":"App\\Publication","mime":"application\/vnd.openxmlformats-officedocument.spreadsheetml.sheet","document_type":"supplementary_data","description_en":"Generic Distribution of Acquisition Costs","description_fr":"R\u00e9partition g\u00e9n\u00e9rique des co\u00fbts d\u0027acquisition","bilingual":false,"urls":{"en":{"public":"https:\/\/pbo-dpb.s3.ca-central-1.amazonaws.com\/files--fichiers\/6fa56cc9d5a3db6266b10b85c7df079d4b771faecd7db8af4c708b199085c5ba"},"fr":{"public":"https:\/\/pbo-dpb.s3.ca-central-1.amazonaws.com\/files--fichiers\/2c1d26e5fb876adfbb093e252cdcaca71aec054657c32ca78e6292d1cfc77706"}},"verbose_document_type":{"en":"Supplementary Data","fr":"Donn\u00e9es Suppl\u00e9mentaires"},"extension":"xlsx"}],"images":[],"bibtex":{"en":"@techreport{PBO-RP2122024S,\n author={Penney, Christopher and Elmarzougui, Eskandar},\n title={The Polar Icebreaker Project: A Fiscal Analysis},\n institution={The Office of the Parliamentary Budget Officer},\n year=2021,\n \n address = \u0022Ottawa, ON\u0022\n}","fr":"@techreport{DPB-RP2122024S,\n author={Penney, Christopher and Elmarzougui, Eskandar},\n title={Le projet de brise-glace polaire : analyse financi\\`{e}re},\n institution={Bureau du directeur parlementaire du budget},\n year=2021,\n \n address = \u0022Ottawa, ON\u0022\n}"}}